Natural gas power plant, Utah

Tesoro SLC Cogeneration Plant, Utah

Tesoro SLC Cogeneration Plant is a 30.4 MW natural gas power plant in Salt Lake County, Utah, operated by Tesoro Refng Marketing Co Mntn Region, and it generated 198,679 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 100th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,500th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30.4 MWNameplate capacity
98%Capacity factor, 2025, 100th percentile, on 23 MW net summer
0.5%Of UT generation, 2025
21 yearsAverage generator age, by MW

How hard does Tesoro SLC Cogeneration Plant run compared with other natural gas plants?

Tesoro SLC Cogeneration Plant had a capacity factor of 98% in 2025 on 23 MW of net summer capacity, the 100th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 356 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Tesoro SLC Cogeneration Plant98%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Tesoro SLC Cogeneration Plant generating more or less than last year?

Generation at Tesoro SLC Cogeneration Plant rose 7.3% from 2024 to 2025, from 185,084 MWh to 198,679 MWh. Through August 2026 it is running 2.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024185,084
2025198,679
2026 through August133,896
2025, same months131,149
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,769
July 202616,216
June 202616,842
May 202616,717
April 202615,746
March 202617,531
February 202616,626
January 202617,449
December 202518,386
November 202517,259
October 202515,276
September 202516,609
August 202516,573
July 202516,718
June 202515,057
May 202516,419
April 202515,021
March 202516,481
February 202516,511
January 202518,369
December 202417,666
November 202418,135
October 202416,313
September 202412,402
August 202413,724
July 202414,010
June 202414,959
May 202414,848
April 202415,466
March 202415,077
February 202414,489
January 202417,995

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from Tesoro SLC Cogeneration Plant?

Tesoro SLC Cogeneration Plant made 0.5% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.3% of the state's 11,140 MW of capacity. Its share of output is 1.9 times its share of capacity. By capacity it is the 49th largest of 126 plants in Utah, the 4,345th largest of 14,327 in the U.S. and the 1,208th largest of 1,962 natural gas plants. By 2025 generation it is the 31st largest of 117 generating plants in the state.

Tesoro SLC Cogeneration Plant within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)3011,1400.3%
Generation (MWh)198,67938,124,6790.5%
Natural gas capacity (MW)304,0230.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Tesoro SLC Cogeneration Plant, and when do they retire?

2 operable generators total 30.4 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s230100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine152004n/a
2OperatingNatural Gas Fired Combustion Turbine152004n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Tesoro SLC Cogeneration Plant?

Marathon Petroleum Company LP is the only joint owner reported for Tesoro SLC Cogeneration Plant, with 100.0%. Tesoro Refng Marketing Co Mntn Region operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Tesoro SLC Cogeneration Plant?

Tesoro SLC Cogeneration Plant is in Salt Lake City, Salt Lake County, Utah, at 40.7931° N, 111.9038° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Utah are similar in size?

Utah has 22 operable natural gas plants with 4,023 MW of capacity, and Tesoro SLC Cogeneration Plant's 30.4 MW is 1% of that.

Natural gas plants in Utah around this size
PlantCountyMW2025 MWh
Murray TurbineSalt Lake42220
Bountiful CityDavis3031,268
Tesoro SLC Cogeneration PlantSalt Lake30196,574
WhiteheadUtah2711,328
Heber CityWasatch1816,539
BYU Central Heating PlantUtah17115,862

Source: EIA Forms EIA-860 and EIA-923, 2025.