Natural gas power plant, Utah
Tesoro SLC Cogeneration Plant, Utah
Tesoro SLC Cogeneration Plant is a 30.4 MW natural gas power plant in Salt Lake County, Utah, operated by Tesoro Refng Marketing Co Mntn Region, and it generated 198,679 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 100th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,500th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Tesoro SLC Cogeneration Plant run compared with other natural gas plants?
Tesoro SLC Cogeneration Plant had a capacity factor of 98% in 2025 on 23 MW of net summer capacity, the 100th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 356 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Tesoro SLC Cogeneration Plant | 98% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Tesoro SLC Cogeneration Plant generating more or less than last year?
Generation at Tesoro SLC Cogeneration Plant rose 7.3% from 2024 to 2025, from 185,084 MWh to 198,679 MWh. Through August 2026 it is running 2.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 185,084 |
| 2025 | 198,679 |
| 2026 through August | 133,896 |
| 2025, same months | 131,149 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 16,769 |
| July 2026 | 16,216 |
| June 2026 | 16,842 |
| May 2026 | 16,717 |
| April 2026 | 15,746 |
| March 2026 | 17,531 |
| February 2026 | 16,626 |
| January 2026 | 17,449 |
| December 2025 | 18,386 |
| November 2025 | 17,259 |
| October 2025 | 15,276 |
| September 2025 | 16,609 |
| August 2025 | 16,573 |
| July 2025 | 16,718 |
| June 2025 | 15,057 |
| May 2025 | 16,419 |
| April 2025 | 15,021 |
| March 2025 | 16,481 |
| February 2025 | 16,511 |
| January 2025 | 18,369 |
| December 2024 | 17,666 |
| November 2024 | 18,135 |
| October 2024 | 16,313 |
| September 2024 | 12,402 |
| August 2024 | 13,724 |
| July 2024 | 14,010 |
| June 2024 | 14,959 |
| May 2024 | 14,848 |
| April 2024 | 15,466 |
| March 2024 | 15,077 |
| February 2024 | 14,489 |
| January 2024 | 17,995 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Tesoro SLC Cogeneration Plant, and when do they retire?
2 operable generators total 30.4 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 30 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Natural Gas Fired Combustion Turbine | 15 | 2004 | n/a |
| 2 | Operating | Natural Gas Fired Combustion Turbine | 15 | 2004 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Tesoro SLC Cogeneration Plant?
Marathon Petroleum Company LP is the only joint owner reported for Tesoro SLC Cogeneration Plant, with 100.0%. Tesoro Refng Marketing Co Mntn Region operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Tesoro SLC Cogeneration Plant?
Tesoro SLC Cogeneration Plant is in Salt Lake City, Salt Lake County, Utah, at 40.7931° N, 111.9038° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Utah are similar in size?
Utah has 22 operable natural gas plants with 4,023 MW of capacity, and Tesoro SLC Cogeneration Plant's 30.4 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Murray Turbine | Salt Lake | 42 | 220 |
| Bountiful City | Davis | 30 | 31,268 |
| Tesoro SLC Cogeneration Plant | Salt Lake | 30 | 196,574 |
| Whitehead | Utah | 27 | 11,328 |
| Heber City | Wasatch | 18 | 16,539 |
| BYU Central Heating Plant | Utah | 17 | 115,862 |
Source: EIA Forms EIA-860 and EIA-923, 2025.