Whitehead natural gas power plant, Utah

Whitehead is a 26.5 MW natural gas power plant in Utah County, Utah, operated by City of Springville-(UT), and it generated 11,437 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 24th percentile of U.S. natural gas plants. By 2025 generation it ranks 5,900th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

26.5 MWNameplate capacity
5%Capacity factor, 2025, 24th percentile, on 24.4 MW net summer
5,900thU.S. rank by generation, 2025
23 yearsAverage generator age, by MW

How hard does the Whitehead plant run compared with other natural gas plants?

The Whitehead plant had a capacity factor of 5% in 2025 on 24.4 MW of net summer capacity, the 24th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 19 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Whitehead5%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Whitehead plant generating more or less than last year?

Generation at Whitehead rose 1.5% from 2024 to 2025, from 11,267 MWh to 11,437 MWh.

Net generation by period
PeriodMWh
202411,267
202511,437
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,029
November 2025955
October 2025902
September 20251,103
August 20251,170
July 20251,150
June 20251,039
May 2025688
April 2025578
March 2025833
February 2025886
January 20251,104
December 20241,007
November 2024779
October 2024980
September 2024913
August 20241,091
July 20241,100
June 2024933
May 2024782
April 2024661
March 2024881
February 20241,016
January 20241,125

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Whitehead plant?

Whitehead made 0.0% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.2% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 53rd largest of 126 plants in Utah, the 4,509th largest of 14,327 in the U.S. and the 1,235th largest of 1,962 natural gas plants. By 2025 generation it is the 67th largest of 117 generating plants in the state.

Whitehead within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)2711,1400.2%
Generation (MWh)11,43738,124,6790.0%
Natural gas capacity (MW)274,0230.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Whitehead plant, and when do they retire?

7 operable generators total 26.5 MW, with an average age of 23 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 12 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s21453%none reported
2010s2519%none reported
2020s3828%none reported
Every generator, 9 in all
UnitStatusTechnologyMWIn servicePlanned retirement
K1OperatingNatural Gas Internal Combustion Engine71986n/a
K2OperatingNatural Gas Internal Combustion Engine71986n/a
K6CATOperatingNatural Gas Internal Combustion Engine32016n/a
K7CATOperatingNatural Gas Internal Combustion Engine32016n/a
K3CATOperatingNatural Gas Internal Combustion Engine32024n/a
K4CATOperatingNatural Gas Internal Combustion Engine32024n/a
K5CATOperatingNatural Gas Internal Combustion Engine32024n/a
K3RetiredNatural Gas Internal Combustion Engine720002023
K4RetiredNatural Gas Internal Combustion Engine520022023

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Whitehead plant?

EIA lists no joint owners for Whitehead. City of Springville-(UT) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Springville charge homes?

City of Springville, the operator of Whitehead, had an average residential price of 12.95¢ per kWh and an average bill of $102 a month in 2025, 1% below the Utah average of 13.02¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Utah
City of Springville12.95¢$1021% lower
Utah average13.02¢$99
U.S. average17.23¢$15132% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Whitehead plant?

Whitehead is in Springville, Utah County, Utah, at 40.1817° N, 111.6203° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Utah are similar in size?

Utah has 22 operable natural gas plants with 4,023 MW of capacity, and Whitehead's 26.5 MW is 1% of that.

Natural gas plants in Utah around this size
PlantCountyMW2025 MWh
Murray TurbineSalt Lake42220
Bountiful CityDavis3031,268
Tesoro SLC Cogeneration PlantSalt Lake30196,574
WhiteheadUtah2711,328
Heber CityWasatch1816,539
BYU Central Heating PlantUtah17115,862
Logan CityCache161,974

Source: EIA Forms EIA-860 and EIA-923, 2025.