Natural gas power plant, Texas

Texas City Power Plant, Texas

Texas City Power Plant is a 450 MW natural gas power plant in Galveston County, Texas, operated by Texas City Cogeneration LLC, and it generated 1,772,641 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Texas, and its capacity factor sits at the 69th percentile of U.S. natural gas plants. By 2025 generation it ranks 546th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

450 MWNameplate capacity
48%Capacity factor, 2025, 69th percentile, on 418 MW net summer
0.3%Of TX generation, 2025
38 yearsAverage generator age, by MW

How hard does Texas City Power Plant run compared with other natural gas plants?

Texas City Power Plant had a capacity factor of 48% in 2025 on 418 MW of net summer capacity, the 69th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 177 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Texas City Power Plant48%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Texas City Power Plant generating more or less than last year?

Generation at Texas City Power Plant fell 16.8% from 2024 to 2025, from 2,131,564 MWh to 1,772,641 MWh. Through August 2026 it is running 35.4% behind the same months of 2025.

Net generation by period
PeriodMWh
20242,131,564
20251,772,641
2026 through August789,003
2025, same months1,221,002
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026250,175
July 2026256,382
June 202645,327
May 2026929
April 202686
March 20260
February 202685,846
January 2026150,258
December 2025127,646
November 202589,723
October 2025183,485
September 2025150,785
August 2025238,995
July 2025109,646
June 2025147,831
May 2025165,737
April 2025114,959
March 2025109,646
February 2025121,594
January 2025212,594
December 2024123,908
November 2024188,372
October 2024173,940
September 2024198,055
August 2024216,121
July 2024208,206
June 2024212,774
May 2024188,069
April 202489,061
March 2024210,694
February 2024134,641
January 2024187,723

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from Texas City Power Plant?

Texas City Power Plant made 0.3% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 117th largest of 1,023 plants in Texas, the 793rd largest of 14,327 in the U.S. and the 487th largest of 1,962 natural gas plants. By 2025 generation it is the 79th largest of 816 generating plants in the state.

Texas City Power Plant within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)450195,9660.2%
Generation (MWh)1,772,641592,896,1760.3%
Natural gas capacity (MW)45081,5740.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Texas City Power Plant, and when do they retire?

4 operable generators total 450 MW, with an average age of 38 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s4450100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingNatural Gas Fired Combined Cycle1411987n/a
GEN2OperatingNatural Gas Fired Combined Cycle1031987n/a
GEN3OperatingNatural Gas Fired Combined Cycle1031987n/a
GEN4OperatingNatural Gas Fired Combined Cycle1031987n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Texas City Power Plant?

EIA lists no joint owners for Texas City Power Plant. Texas City Cogeneration LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Texas City Power Plant?

Texas City Power Plant is in Texas City, Galveston County, Texas, at 29.3787° N, 94.9438° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Texas City Power Plant's 450 MW is 1% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
Mustang Station Unit 4Yoakum4722,135,434
Gregory Power PlantSan Patricio470639,865
Eastman Cogeneration FacilityHarrison4682,640,665
Texas City Power PlantGalveston4501,772,641
Permian BasinWard447660,536
Greens BayouHarris43217,563
Ray OlingerCollin42851,072

Source: EIA Forms EIA-860 and EIA-923, 2025.