Petroleum power plant, Connecticut
Torrington petroleum power plant, Connecticut
Torrington is a 21.8 MW petroleum power plant in Litchfield County, Connecticut, operated by Connecticut Jet Power LLC, and it generated 277 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 15th percentile of U.S. petroleum plants. By 2025 generation it ranks 12,335th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Torrington plant run compared with other petroleum plants?
The Torrington plant had a capacity factor of under 1% in 2025 on 17.4 MW of net summer capacity, the 15th percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.
0%Shaded: the middle half of petroleum plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Torrington | under 1% |
| Petroleum plants, 75th percentile | 1% |
| Petroleum plants, median | 1% |
| Petroleum plants, 25th percentile | 0% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Torrington plant generating more or less than last year?
Generation at Torrington rose 89.7% from 2024 to 2025, from 146 MWh to 277 MWh.
| Period | MWh |
|---|---|
| 2024 | 146 |
| 2025 | 277 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 10 |
| November 2025 | 25 |
| October 2025 | 21 |
| September 2025 | 10 |
| August 2025 | 64 |
| July 2025 | 12 |
| June 2025 | 12 |
| May 2025 | 7 |
| April 2025 | 15 |
| March 2025 | 14 |
| February 2025 | 56 |
| January 2025 | 31 |
| December 2024 | 22 |
| November 2024 | 7 |
| October 2024 | 12 |
| September 2024 | 8 |
| August 2024 | 7 |
| July 2024 | 7 |
| June 2024 | 7 |
| May 2024 | 10 |
| April 2024 | 7 |
| March 2024 | 11 |
| February 2024 | 14 |
| January 2024 | 33 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Torrington plant, and when do they retire?
1 operable generator totals 21.8 MW, with an average age of 58 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1960s | 1 | 22 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| UN10 | Operating | Petroleum Liquids | 22 | 1967 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Torrington plant?
EIA lists no joint owners for Torrington. Connecticut Jet Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Torrington plant?
Torrington is in Torrington, Litchfield County, Connecticut, at 41.7761° N, 73.1209° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which petroleum plants in Connecticut are similar in size?
Connecticut has 23 operable petroleum plants with 2,531 MW of capacity, and Torrington's 21.8 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Branford | New Haven | 22 | 288 |
| Franklin Drive | Litchfield | 22 | 294 |
| Torrington | Litchfield | 22 | 277 |
| Tunnel | New London | 19 | 0 |