Petroleum power plant, Connecticut

Tunnel petroleum power plant, Connecticut

Tunnel is a 20.5 MW power plant, 18.5 MW of it petroleum, in New London County, Connecticut, operated by FirstLight Power Resources Services LLC, and it generated 5,929 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 7,715th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20.5 MWNameplate capacity
n/aCapacity factor, 2025, petroleum units
7,715thU.S. rank by generation, 2025
59 yearsAverage generator age, by MW

Is the Tunnel plant generating more or less than last year?

Tunnel generated 5,929 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.

Net generation by period
PeriodMWh
20247,722
20255,929
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025675
November 2025549
October 202593
September 20250
August 20250
July 2025153
June 2025433
May 20251,310
April 20251,215
March 20251,134
February 2025163
January 2025204
December 2024329
November 20240
October 20240
September 20245
August 20248
July 2024114
June 2024444
May 20241,380
April 20241,280
March 20241,440
February 20241,340
January 20241,382

Source: EIA Form EIA-923, through August 2026.

How much of Connecticut's electricity comes from the Tunnel plant?

Tunnel made 0.0% of the 43,744,586 MWh reported by Connecticut plants in 2025, from 0.2% of the state's 10,990 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 35th largest of 182 plants in Connecticut, the 4,765th largest of 14,327 in the U.S. and the 189th largest of 861 petroleum plants on its petroleum units alone. By 2025 generation it is the 76th largest of 168 generating plants in the state.

Tunnel within Connecticut, 2025
MeasureThis plantConnecticutShare
Capacity (MW)2110,9900.2%
Generation (MWh)5,92943,744,5860.0%
Petroleum capacity (MW)192,5310.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Tunnel plant, and when do they retire?

3 operable generators total 20.5 MW, with an average age of 59 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1910s115%none reported
1940s115%none reported
1960s11990%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric11919n/a
2OperatingConventional Hydroelectric11949n/a
10On standbyPetroleum Liquids191969n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Tunnel plant?

FirstLight Hydro Generating Company is the only joint owner reported for Tunnel, with 100.0%. FirstLight Power Resources Services LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Tunnel plant use?

Tunnel has capacity on 2 fuels: 90% petroleum and 10% hydro. In 2025, petroleum made 0% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Petroleum1990.2%0
Hydro29.8%5,929

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Tunnel plant?

Tunnel is in Preston, New London County, Connecticut, at 41.5554° N, 72.0418° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which petroleum plants in Connecticut are similar in size?

Connecticut has 23 operable petroleum plants with 2,531 MW of capacity, and Tunnel's 18.5 MW is 1% of that.

Petroleum plants in Connecticut around this size
PlantCountyMW2025 MWh
BranfordNew Haven22288
Franklin DriveLitchfield22294
TorringtonLitchfield22277
TunnelNew London190
Fort Hill 1, 2, 3 & 4New London10579
Backus Microgrid ProjectNew London10638

Source: EIA Forms EIA-860 and EIA-923, 2025.