Petroleum power plant, Connecticut
Tunnel petroleum power plant, Connecticut
Tunnel is a 20.5 MW power plant, 18.5 MW of it petroleum, in New London County, Connecticut, operated by FirstLight Power Resources Services LLC, and it generated 5,929 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 7,715th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
Is the Tunnel plant generating more or less than last year?
Tunnel generated 5,929 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 7,722 |
| 2025 | 5,929 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 675 |
| November 2025 | 549 |
| October 2025 | 93 |
| September 2025 | 0 |
| August 2025 | 0 |
| July 2025 | 153 |
| June 2025 | 433 |
| May 2025 | 1,310 |
| April 2025 | 1,215 |
| March 2025 | 1,134 |
| February 2025 | 163 |
| January 2025 | 204 |
| December 2024 | 329 |
| November 2024 | 0 |
| October 2024 | 0 |
| September 2024 | 5 |
| August 2024 | 8 |
| July 2024 | 114 |
| June 2024 | 444 |
| May 2024 | 1,380 |
| April 2024 | 1,280 |
| March 2024 | 1,440 |
| February 2024 | 1,340 |
| January 2024 | 1,382 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Tunnel plant, and when do they retire?
3 operable generators total 20.5 MW, with an average age of 59 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1910s | 1 | 1 | 5% | none reported |
| 1940s | 1 | 1 | 5% | none reported |
| 1960s | 1 | 19 | 90% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 1 | 1919 | n/a |
| 2 | Operating | Conventional Hydroelectric | 1 | 1949 | n/a |
| 10 | On standby | Petroleum Liquids | 19 | 1969 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Tunnel plant?
FirstLight Hydro Generating Company is the only joint owner reported for Tunnel, with 100.0%. FirstLight Power Resources Services LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Tunnel plant use?
Tunnel has capacity on 2 fuels: 90% petroleum and 10% hydro. In 2025, petroleum made 0% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Petroleum | 19 | 90.2% | 0 |
| Hydro | 2 | 9.8% | 5,929 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Tunnel plant?
Tunnel is in Preston, New London County, Connecticut, at 41.5554° N, 72.0418° W. It sits in the ISO New England Inc. balancing area (NERC region NPCC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which petroleum plants in Connecticut are similar in size?
Connecticut has 23 operable petroleum plants with 2,531 MW of capacity, and Tunnel's 18.5 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Branford | New Haven | 22 | 288 |
| Franklin Drive | Litchfield | 22 | 294 |
| Torrington | Litchfield | 22 | 277 |
| Tunnel | New London | 19 | 0 |
| Fort Hill 1, 2, 3 & 4 | New London | 10 | 579 |
| Backus Microgrid Project | New London | 10 | 638 |
Source: EIA Forms EIA-860 and EIA-923, 2025.