Coal power plant, Nevada

TS Power Plant, Nevada

TS Power Plant is a 442 MW power plant, 242 MW of it coal, in Eureka County, Nevada, operated by Nevada Gold Energy, LLC, and it generated 1,717,988 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.8% of the generation reported in Nevada, and its capacity factor sits at the 83rd percentile of U.S. coal plants. By 2025 generation it ranks 552nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

442 MWNameplate capacity
68%Capacity factor, 2025, coal units, 83rd percentile, on 218 MW net summer
3.8%Of NV generation, 2025
10 yearsAverage generator age, by MW

How hard does TS Power Plant run compared with other coal plants?

TS Power Plant's coal units had a capacity factor of 68% in 2025 on 218 MW of net summer capacity, the 83rd percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 248 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
TS Power Plant68%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its coal generators only. Values above 105% are left out of the comparison.

Is TS Power Plant generating more or less than last year?

Generation at TS Power Plant rose 25.9% from 2024 to 2025, from 1,364,238 MWh to 1,717,988 MWh. Through August 2026 it is running 8.3% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,364,238
20251,717,988
2026 through August1,051,560
2025, same months1,146,950
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026176,332
July 2026173,346
June 2026157,750
May 2026131,108
April 202648,234
March 2026101,455
February 2026132,302
January 2026131,033
December 2025148,522
November 2025118,079
October 2025167,874
September 2025136,563
August 2025155,443
July 2025176,104
June 2025170,063
May 2025160,603
April 202548,649
March 2025157,900
February 2025138,889
January 2025139,299
December 2024129,578
November 202499,537
October 2024106,298
September 2024127,255
August 2024150,962
July 2024166,635
June 2024132,454
May 202487,986
April 202461,072
March 202488,164
February 202475,121
January 2024139,176

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from TS Power Plant?

TS Power Plant made 3.8% of the 45,180,066 MWh reported by Nevada plants in 2025, from 2.3% of the state's 18,959 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 12th largest of 117 plants in Nevada, the 808th largest of 14,327 in the U.S. and the 142nd largest of 195 coal plants on its coal units alone. By 2025 generation it is the 8th largest of 112 generating plants in the state.

TS Power Plant within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)44218,9592.3%
Generation (MWh)1,717,98845,180,0663.8%
Coal capacity (MW)24253245.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at TS Power Plant, and when do they retire?

3 operable generators total 442 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s124255%none reported
2020s220045%none reported
Every generator, 7 in all
UnitStatusTechnologyMWIn servicePlanned retirement
001OperatingConventional Steam Coal2422008n/a
SOL1OperatingSolar Photovoltaic1002024n/a
SOL2OperatingSolar Photovoltaic1002024n/a
002CancelledPetroleum Liquids42n/an/a
003CancelledPetroleum Liquids42n/an/a
004CancelledPetroleum Liquids42n/an/a
005CancelledPetroleum Liquids42n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns TS Power Plant?

EIA lists no joint owners for TS Power Plant. Nevada Gold Energy, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does TS Power Plant use?

TS Power Plant has capacity on 2 fuels: 55% coal and 45% solar. In 2025, coal made 76% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Coal24254.8%1,301,511
Solar20045.2%414,364

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is TS Power Plant?

TS Power Plant is in Battle Mountain, Eureka County, Nevada, at 40.7461° N, 116.5297° W. It sits in the Nevada Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Nevada are similar in size?

Nevada has 2 operable coal plants with 532 MW of capacity, and TS Power Plant's 242 MW is 46% of that.

Coal plants in Nevada around this size
PlantCountyMW2025 MWh
North ValmyHumboldt2901,287,217
TS Power PlantEureka2421,301,511

Source: EIA Forms EIA-860 and EIA-923, 2025.