Coal power plant, Nevada
TS Power Plant, Nevada
TS Power Plant is a 442 MW power plant, 242 MW of it coal, in Eureka County, Nevada, operated by Nevada Gold Energy, LLC, and it generated 1,717,988 MWh in 2025 (Forms EIA-860 and EIA-923). That is 3.8% of the generation reported in Nevada, and its capacity factor sits at the 83rd percentile of U.S. coal plants. By 2025 generation it ranks 552nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does TS Power Plant run compared with other coal plants?
TS Power Plant's coal units had a capacity factor of 68% in 2025 on 218 MW of net summer capacity, the 83rd percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 248 days at full output out of 365.
0%Shaded: the middle half of coal plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| TS Power Plant | 68% |
| Coal plants, 75th percentile | 63% |
| Coal plants, median | 49% |
| Coal plants, 25th percentile | 37% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its coal generators only. Values above 105% are left out of the comparison.
Is TS Power Plant generating more or less than last year?
Generation at TS Power Plant rose 25.9% from 2024 to 2025, from 1,364,238 MWh to 1,717,988 MWh. Through August 2026 it is running 8.3% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,364,238 |
| 2025 | 1,717,988 |
| 2026 through August | 1,051,560 |
| 2025, same months | 1,146,950 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 176,332 |
| July 2026 | 173,346 |
| June 2026 | 157,750 |
| May 2026 | 131,108 |
| April 2026 | 48,234 |
| March 2026 | 101,455 |
| February 2026 | 132,302 |
| January 2026 | 131,033 |
| December 2025 | 148,522 |
| November 2025 | 118,079 |
| October 2025 | 167,874 |
| September 2025 | 136,563 |
| August 2025 | 155,443 |
| July 2025 | 176,104 |
| June 2025 | 170,063 |
| May 2025 | 160,603 |
| April 2025 | 48,649 |
| March 2025 | 157,900 |
| February 2025 | 138,889 |
| January 2025 | 139,299 |
| December 2024 | 129,578 |
| November 2024 | 99,537 |
| October 2024 | 106,298 |
| September 2024 | 127,255 |
| August 2024 | 150,962 |
| July 2024 | 166,635 |
| June 2024 | 132,454 |
| May 2024 | 87,986 |
| April 2024 | 61,072 |
| March 2024 | 88,164 |
| February 2024 | 75,121 |
| January 2024 | 139,176 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at TS Power Plant, and when do they retire?
3 operable generators total 442 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 242 | 55% | none reported |
| 2020s | 2 | 200 | 45% | none reported |
Every generator, 7 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 001 | Operating | Conventional Steam Coal | 242 | 2008 | n/a |
| SOL1 | Operating | Solar Photovoltaic | 100 | 2024 | n/a |
| SOL2 | Operating | Solar Photovoltaic | 100 | 2024 | n/a |
| 002 | Cancelled | Petroleum Liquids | 42 | n/a | n/a |
| 003 | Cancelled | Petroleum Liquids | 42 | n/a | n/a |
| 004 | Cancelled | Petroleum Liquids | 42 | n/a | n/a |
| 005 | Cancelled | Petroleum Liquids | 42 | n/a | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns TS Power Plant?
EIA lists no joint owners for TS Power Plant. Nevada Gold Energy, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does TS Power Plant use?
TS Power Plant has capacity on 2 fuels: 55% coal and 45% solar. In 2025, coal made 76% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Coal | 242 | 54.8% | 1,301,511 |
| Solar | 200 | 45.2% | 414,364 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is TS Power Plant?
TS Power Plant is in Battle Mountain, Eureka County, Nevada, at 40.7461° N, 116.5297° W. It sits in the Nevada Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which coal plants in Nevada are similar in size?
Nevada has 2 operable coal plants with 532 MW of capacity, and TS Power Plant's 242 MW is 46% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| North Valmy | Humboldt | 290 | 1,287,217 |
| TS Power Plant | Eureka | 242 | 1,301,511 |
Source: EIA Forms EIA-860 and EIA-923, 2025.