Tule Wind LLC power plant, California

Tule Wind LLC is a 143 MW wind power plant in San Diego County, California, operated by Avangrid Power LLC, and it generated 365,139 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 36th percentile of U.S. wind plants. By 2025 generation it ranks 1,709th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

143 MWNameplate capacity
29%Capacity factor, 2025, 36th percentile, on 143 MW net summer
0.2%Of CA generation, 2025
8 yearsAverage generator age, by MW

How hard does the Tule Wind LLC plant run compared with other wind plants?

The Tule Wind LLC plant had a capacity factor of 29% in 2025 on 143 MW of net summer capacity, the 36th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Tule Wind LLC29%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Tule Wind LLC plant generating more or less than last year?

Generation at Tule Wind LLC rose 15.3% from 2024 to 2025, from 316,801 MWh to 365,139 MWh. Through August 2026 it is running 6.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024316,801
2025365,139
2026 through August251,893
2025, same months268,040
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202622,706
July 202626,952
June 202635,689
May 202639,623
April 202639,476
March 202630,677
February 202628,335
January 202628,435
December 202527,473
November 202525,427
October 202524,986
September 202519,213
August 202519,633
July 202529,577
June 202525,909
May 202536,158
April 202537,669
March 202545,555
February 202530,386
January 202543,153
December 202418,259
November 202423,245
October 202422,988
September 202421,049
August 202429,005
July 202418,622
June 202426,481
May 202433,730
April 202428,966
March 202434,693
February 202431,111
January 202428,652

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Tule Wind LLC plant?

Tule Wind LLC made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 196th largest of 1,877 plants in California, the 2,120th largest of 14,327 in the U.S. and the 509th largest of 1,358 wind plants. By 2025 generation it is the 130th largest of 1,608 generating plants in the state.

Tule Wind LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)143107,4330.1%
Generation (MWh)365,139204,542,8980.2%
Wind capacity (MW)1436,4792.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Tule Wind LLC plant, and when do they retire?

1 operable generator totals 143 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1143100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1432017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Tule Wind LLC plant?

EIA lists no joint owners for Tule Wind LLC. Avangrid Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Tule Wind LLC plant?

Tule Wind LLC is in Boulevard, San Diego County, California, at 32.6639° N, 116.2897° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in California are similar in size?

California has 111 operable wind plants with 6,479 MW of capacity, and Tule Wind LLC's 143 MW is 2% of that.

Wind plants in California around this size
PlantCountyMW2025 MWh
Alta Wind Energy Center IIIKern150318,266
Mustang Hills LLCKern150267,144
Alta Wind VIIIKern150219,153
Tule Wind LLCSan Diego143365,139
Alta Wind XKern138361,130
Pine Tree Wind Power ProjectKern135123,003
Pinyon Pine IIKern132204,303