Skip to main content
RateWatt

Wind power plant, Texas

Tyler Bluff Wind Project, LLC power plant, Texas

Tyler Bluff Wind Project, LLC is a 126 MW wind power plant in Cooke County, Texas, operated by Southern Power Co, and it generated 332,118 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 40th percentile of U.S. wind plants. By 2025 generation it ranks 1,839th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

126 MWNameplate capacity
30%Capacity factor, 2025, 40th percentile, on 125 MW net summer
0.1%Of TX generation, 2025
9 yearsAverage generator age, by MW

How hard does the Tyler Bluff Wind Project, LLC plant run compared with other wind plants?

The Tyler Bluff Wind Project, LLC plant had a capacity factor of 30% in 2025 on 125 MW of net summer capacity, the 40th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 111 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Tyler Bluff Wind Project, LLC30%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Tyler Bluff Wind Project, LLC plant generating more or less than last year?

Generation at Tyler Bluff Wind Project, LLC fell 11.0% from 2024 to 2025, from 373,278 MWh to 332,118 MWh. Through August 2026 it is running 14.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024373,278
2025332,118
2026 through August267,974
2025, same months234,633
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,391
July 202624,895
June 202638,413
May 202629,944
April 202641,709
March 202648,628
February 202627,867
January 202624,127
December 202524,455
November 202528,212
October 202525,876
September 202518,942
August 202517,569
July 202526,780
June 202529,034
May 202525,275
April 202529,960
March 202547,993
February 202527,384
January 202530,638
December 202429,442
November 202433,260
October 202434,104
September 202414,578
August 202424,605
July 202423,927
June 202427,099
May 202431,069
April 202442,884
March 202441,549
February 202439,589
January 202431,172

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Tyler Bluff Wind Project, LLC plant?

Tyler Bluff Wind Project, LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 456th largest of 1,023 plants in Texas, the 2,262nd largest of 14,327 in the U.S. and the 547th largest of 1,358 wind plants. By 2025 generation it is the 373rd largest of 816 generating plants in the state.

Tyler Bluff Wind Project, LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)126195,9660.1%
Generation (MWh)332,118592,896,1760.1%
Wind capacity (MW)12643,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Tyler Bluff Wind Project, LLC plant, and when do they retire?

1 operable generator totals 126 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1126100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingOnshore Wind Turbine1262016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Tyler Bluff Wind Project, LLC plant?

Tyler Bluff Wind Project, LLC is the only joint owner reported for Tyler Bluff Wind Project, LLC, with 100.0%. Southern Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Tyler Bluff Wind Project, LLC plant?

Tyler Bluff Wind Project, LLC is in Muenster, Cooke County, Texas, at 33.7039° N, 97.3720° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Tyler Bluff Wind Project, LLC's 126 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Sherbino IIPecos132538,795
Scurry County Wind LPScurry131252,175
Champion Wind Farm LLCNolan127382,265
Tyler Bluff Wind Project, LLCCooke126332,118
Forest Creek Wind Farm LLCGlasscock124128,394
Elbow Creek Wind Project LLCHoward122357,869
Buffalo Gap Wind FarmTaylor121141,946

Source: EIA Forms EIA-860 and EIA-923, 2025.