Sherbino II wind power plant, Texas

Sherbino II is a 132 MW wind power plant in Pecos County, Texas, operated by Sherbino II Wind Farm LLC, and it generated 538,795 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 94th percentile of U.S. wind plants. By 2025 generation it ranks 1,269th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

132 MWNameplate capacity
47%Capacity factor, 2025, 94th percentile, on 132 MW net summer
0.1%Of TX generation, 2025
14 yearsAverage generator age, by MW

How hard does the Sherbino II plant run compared with other wind plants?

The Sherbino II plant had a capacity factor of 47% in 2025 on 132 MW of net summer capacity, the 94th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 170 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sherbino II47%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sherbino II plant generating more or less than last year?

Generation at Sherbino II fell 5.6% from 2024 to 2025, from 570,628 MWh to 538,795 MWh.

Net generation by period
PeriodMWh
2024570,628
2025538,795
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202540,028
November 202543,455
October 202551,753
September 202549,399
August 202548,776
July 202552,767
June 202555,000
May 202537,044
April 202551,062
March 202546,758
February 202531,964
January 202530,789
December 202444,305
November 202447,118
October 202450,342
September 202436,609
August 202453,317
July 202446,956
June 202464,243
May 202448,658
April 202450,207
March 202445,447
February 202444,443
January 202438,983

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Sherbino II plant?

Sherbino II made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 450th largest of 1,023 plants in Texas, the 2,191st largest of 14,327 in the U.S. and the 529th largest of 1,358 wind plants. By 2025 generation it is the 262nd largest of 816 generating plants in the state.

Sherbino II within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)132195,9660.1%
Generation (MWh)538,795592,896,1760.1%
Wind capacity (MW)13243,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sherbino II plant, and when do they retire?

1 operable generator totals 132 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1132100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine1322011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sherbino II plant?

2 owners report shares in Sherbino II; Texas Wind Repower HoldCo, L.P. c/o Concord Infrastructure Investments, LLC holds the largest named share, 66.6% or about 87.9 MW. Sherbino II Wind Farm LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Texas Wind Repower HoldCo, L.P. c/o Concord Infrastructure Investments, LLC66.6%88358,837
UBS Asset Management (Americas) Inc33.4%44179,958

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Sherbino II plant?

Sherbino II is in Ft. Stockton, Pecos County, Texas, at 30.7726° N, 102.5058° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Sherbino II's 132 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Pioneer Hutt Wind EnergyMidland140609,363
Blue Summit Wind LLCWilbarger135491,750
Sweetwater Wind 3 LLCNolan135472,294
Sherbino IIPecos132538,795
Scurry County Wind LPScurry131252,175
Champion Wind Farm LLCNolan127382,265
Tyler Bluff Wind Project, LLCCooke126332,118