Wind power plant, Texas
Blue Summit Wind LLC power plant, Texas
Blue Summit Wind LLC is a 135 MW wind power plant in Wilbarger County, Texas, operated by Blue Summit Wind LLC, and it generated 491,750 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 79th percentile of U.S. wind plants. By 2025 generation it ranks 1,357th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Blue Summit Wind LLC plant run compared with other wind plants?
The Blue Summit Wind LLC plant had a capacity factor of 41% in 2025 on 135 MW of net summer capacity, the 79th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 151 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Blue Summit Wind LLC | 41% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Blue Summit Wind LLC plant generating more or less than last year?
Generation at Blue Summit Wind LLC fell 3.2% from 2024 to 2025, from 508,146 MWh to 491,750 MWh.
| Period | MWh |
|---|---|
| 2024 | 508,146 |
| 2025 | 491,750 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 50,746 |
| November 2025 | 39,965 |
| October 2025 | 40,299 |
| September 2025 | 29,020 |
| August 2025 | 29,679 |
| July 2025 | 32,554 |
| June 2025 | 42,669 |
| May 2025 | 35,821 |
| April 2025 | 54,771 |
| March 2025 | 55,030 |
| February 2025 | 39,261 |
| January 2025 | 41,935 |
| December 2024 | 39,817 |
| November 2024 | 45,109 |
| October 2024 | 44,511 |
| September 2024 | 25,009 |
| August 2024 | 37,237 |
| July 2024 | 40,038 |
| June 2024 | 42,690 |
| May 2024 | 45,895 |
| April 2024 | 53,226 |
| March 2024 | 48,641 |
| February 2024 | 49,424 |
| January 2024 | 36,549 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Blue Summit Wind LLC plant, and when do they retire?
1 operable generator totals 135 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 135 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Onshore Wind Turbine | 135 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Blue Summit Wind LLC plant?
EIA lists no joint owners for Blue Summit Wind LLC. Blue Summit Wind LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Blue Summit Wind LLC plant?
Blue Summit Wind LLC is in Vernon, Wilbarger County, Texas, at 34.2929° N, 99.3677° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Blue Summit Wind LLC's 135 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Palmas Wind, LLC | Cameron | 145 | 362,544 |
| Panther Creek Wind Farm I | Howard | 143 | 529,689 |
| Pioneer Hutt Wind Energy | Midland | 140 | 609,363 |
| Blue Summit Wind LLC | Wilbarger | 135 | 491,750 |
| Sweetwater Wind 3 LLC | Nolan | 135 | 472,294 |
| Sherbino II | Pecos | 132 | 538,795 |
| Scurry County Wind LP | Scurry | 131 | 252,175 |
Source: EIA Forms EIA-860 and EIA-923, 2025.