Skip to main content
RateWatt

Wind power plant, Texas

Blue Summit Wind LLC power plant, Texas

Blue Summit Wind LLC is a 135 MW wind power plant in Wilbarger County, Texas, operated by Blue Summit Wind LLC, and it generated 491,750 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 79th percentile of U.S. wind plants. By 2025 generation it ranks 1,357th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

135 MWNameplate capacity
41%Capacity factor, 2025, 79th percentile, on 135 MW net summer
0.1%Of TX generation, 2025
13 yearsAverage generator age, by MW

How hard does the Blue Summit Wind LLC plant run compared with other wind plants?

The Blue Summit Wind LLC plant had a capacity factor of 41% in 2025 on 135 MW of net summer capacity, the 79th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 151 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blue Summit Wind LLC41%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Blue Summit Wind LLC plant generating more or less than last year?

Generation at Blue Summit Wind LLC fell 3.2% from 2024 to 2025, from 508,146 MWh to 491,750 MWh.

Net generation by period
PeriodMWh
2024508,146
2025491,750
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202550,746
November 202539,965
October 202540,299
September 202529,020
August 202529,679
July 202532,554
June 202542,669
May 202535,821
April 202554,771
March 202555,030
February 202539,261
January 202541,935
December 202439,817
November 202445,109
October 202444,511
September 202425,009
August 202437,237
July 202440,038
June 202442,690
May 202445,895
April 202453,226
March 202448,641
February 202449,424
January 202436,549

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Blue Summit Wind LLC plant?

Blue Summit Wind LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 445th largest of 1,023 plants in Texas, the 2,165th largest of 14,327 in the U.S. and the 520th largest of 1,358 wind plants. By 2025 generation it is the 286th largest of 816 generating plants in the state.

Blue Summit Wind LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)135195,9660.1%
Generation (MWh)491,750592,896,1760.1%
Wind capacity (MW)13543,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blue Summit Wind LLC plant, and when do they retire?

1 operable generator totals 135 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1135100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingOnshore Wind Turbine1352012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blue Summit Wind LLC plant?

EIA lists no joint owners for Blue Summit Wind LLC. Blue Summit Wind LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Blue Summit Wind LLC plant?

Blue Summit Wind LLC is in Vernon, Wilbarger County, Texas, at 34.2929° N, 99.3677° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Blue Summit Wind LLC's 135 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Palmas Wind, LLCCameron145362,544
Panther Creek Wind Farm IHoward143529,689
Pioneer Hutt Wind EnergyMidland140609,363
Blue Summit Wind LLCWilbarger135491,750
Sweetwater Wind 3 LLCNolan135472,294
Sherbino IIPecos132538,795
Scurry County Wind LPScurry131252,175

Source: EIA Forms EIA-860 and EIA-923, 2025.