Wind power plant, Texas
Sweetwater Wind 3 LLC power plant, Texas
Sweetwater Wind 3 LLC is a 135 MW wind power plant in Nolan County, Texas, operated by Leeward Asset Management, LLC, and it generated 472,294 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 65th percentile of U.S. wind plants. By 2025 generation it ranks 1,401st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sweetwater Wind 3 LLC plant run compared with other wind plants?
The Sweetwater Wind 3 LLC plant had a capacity factor of 37% in 2025 on 144 MW of net summer capacity, the 65th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 137 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sweetwater Wind 3 LLC | 37% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sweetwater Wind 3 LLC plant generating more or less than last year?
Generation at Sweetwater Wind 3 LLC rose 0.5% from 2024 to 2025, from 469,987 MWh to 472,294 MWh.
| Period | MWh |
|---|---|
| 2024 | 469,987 |
| 2025 | 472,294 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 44,201 |
| November 2025 | 39,470 |
| October 2025 | 39,161 |
| September 2025 | 26,113 |
| August 2025 | 25,942 |
| July 2025 | 33,750 |
| June 2025 | 46,667 |
| May 2025 | 36,958 |
| April 2025 | 50,999 |
| March 2025 | 52,380 |
| February 2025 | 36,391 |
| January 2025 | 40,262 |
| December 2024 | 39,632 |
| November 2024 | 45,963 |
| October 2024 | 41,888 |
| September 2024 | 21,801 |
| August 2024 | 28,468 |
| July 2024 | 31,121 |
| June 2024 | 44,670 |
| May 2024 | 41,727 |
| April 2024 | 49,074 |
| March 2024 | 41,686 |
| February 2024 | 46,099 |
| January 2024 | 37,858 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sweetwater Wind 3 LLC plant, and when do they retire?
1 operable generator totals 135 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 135 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SW3 | Operating | Onshore Wind Turbine | 135 | 2005 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sweetwater Wind 3 LLC plant?
EIA lists no joint owners for Sweetwater Wind 3 LLC. Leeward Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sweetwater Wind 3 LLC plant?
Sweetwater Wind 3 LLC is in Sweetwater, Nolan County, Texas, at 32.2908° N, 100.4219° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Sweetwater Wind 3 LLC's 135 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Panther Creek Wind Farm I | Howard | 143 | 529,689 |
| Pioneer Hutt Wind Energy | Midland | 140 | 609,363 |
| Blue Summit Wind LLC | Wilbarger | 135 | 491,750 |
| Sweetwater Wind 3 LLC | Nolan | 135 | 472,294 |
| Sherbino II | Pecos | 132 | 538,795 |
| Scurry County Wind LP | Scurry | 131 | 252,175 |
| Champion Wind Farm LLC | Nolan | 127 | 382,265 |
Source: EIA Forms EIA-860 and EIA-923, 2025.