Wind power plant, Texas
Pioneer Hutt Wind Energy power plant, Texas
Pioneer Hutt Wind Energy is a 140 MW wind power plant in Midland County, Texas, operated by Pioneer Hutt Wind Energy, LLC, and it generated 609,363 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 98th percentile of U.S. wind plants. By 2025 generation it ranks 1,115th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pioneer Hutt Wind Energy plant run compared with other wind plants?
The Pioneer Hutt Wind Energy plant had a capacity factor of 50% in 2025 on 140 MW of net summer capacity, the 98th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 181 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pioneer Hutt Wind Energy | 50% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Pioneer Hutt Wind Energy plant generating more or less than last year?
Generation at Pioneer Hutt Wind Energy rose 7.0% from 2024 to 2025, from 569,636 MWh to 609,363 MWh. Through August 2026 it is running 4.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 569,636 |
| 2025 | 609,363 |
| 2026 through August | 427,832 |
| 2025, same months | 410,259 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 53,533 |
| July 2026 | 47,866 |
| June 2026 | 61,058 |
| May 2026 | 52,263 |
| April 2026 | 55,488 |
| March 2026 | 63,783 |
| February 2026 | 47,265 |
| January 2026 | 46,576 |
| December 2025 | 51,096 |
| November 2025 | 49,177 |
| October 2025 | 54,925 |
| September 2025 | 43,906 |
| August 2025 | 39,823 |
| July 2025 | 45,694 |
| June 2025 | 61,333 |
| May 2025 | 50,320 |
| April 2025 | 66,346 |
| March 2025 | 56,979 |
| February 2025 | 42,881 |
| January 2025 | 46,883 |
| December 2024 | 47,846 |
| November 2024 | 53,691 |
| October 2024 | 58,950 |
| September 2024 | 37,760 |
| August 2024 | 46,998 |
| July 2024 | 45,326 |
| June 2024 | 51,637 |
| May 2024 | 59,754 |
| April 2024 | 53,834 |
| March 2024 | 51,832 |
| February 2024 | 49,803 |
| January 2024 | 12,205 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pioneer Hutt Wind Energy plant, and when do they retire?
1 operable generator totals 140 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 140 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WPION | Operating | Onshore Wind Turbine | 140 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pioneer Hutt Wind Energy plant?
EIA lists no joint owners for Pioneer Hutt Wind Energy. Pioneer Hutt Wind Energy, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Pioneer Hutt Wind Energy plant?
Pioneer Hutt Wind Energy is in Midland, Midland County, Texas, at 31.7983° N, 101.9043° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Pioneer Hutt Wind Energy's 140 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ranchland Wind Project II | Callahan | 148 | 500,101 |
| Palmas Wind, LLC | Cameron | 145 | 362,544 |
| Panther Creek Wind Farm I | Howard | 143 | 529,689 |
| Pioneer Hutt Wind Energy | Midland | 140 | 609,363 |
| Blue Summit Wind LLC | Wilbarger | 135 | 491,750 |
| Sweetwater Wind 3 LLC | Nolan | 135 | 472,294 |
| Sherbino II | Pecos | 132 | 538,795 |
Source: EIA Forms EIA-860 and EIA-923, 2025.