Wind power plant, Texas
Palmas Wind, LLC power plant, Texas
Palmas Wind, LLC is a 145 MW wind power plant in Cameron County, Texas, operated by Acciona Energy USA Global, LLC, and it generated 362,544 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 35th percentile of U.S. wind plants. By 2025 generation it ranks 1,722nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Palmas Wind, LLC plant run compared with other wind plants?
The Palmas Wind, LLC plant had a capacity factor of 29% in 2025 on 143 MW of net summer capacity, the 35th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 106 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Palmas Wind, LLC | 29% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Palmas Wind, LLC plant generating more or less than last year?
Generation at Palmas Wind, LLC rose 12.9% from 2024 to 2025, from 320,994 MWh to 362,544 MWh. Through August 2026 it is running 0.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 320,994 |
| 2025 | 362,544 |
| 2026 through August | 279,736 |
| 2025, same months | 278,296 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 33,536 |
| July 2026 | 34,892 |
| June 2026 | 30,693 |
| May 2026 | 29,123 |
| April 2026 | 40,241 |
| March 2026 | 45,937 |
| February 2026 | 34,823 |
| January 2026 | 30,491 |
| December 2025 | 19,664 |
| November 2025 | 32,299 |
| October 2025 | 17,846 |
| September 2025 | 14,439 |
| August 2025 | 19,743 |
| July 2025 | 34,457 |
| June 2025 | 30,565 |
| May 2025 | 37,895 |
| April 2025 | 44,982 |
| March 2025 | 40,746 |
| February 2025 | 33,687 |
| January 2025 | 36,221 |
| December 2024 | 23,686 |
| November 2024 | 26,985 |
| October 2024 | 15,285 |
| September 2024 | 18,423 |
| August 2024 | 12,798 |
| July 2024 | 19,447 |
| June 2024 | 29,363 |
| May 2024 | 28,032 |
| April 2024 | 45,252 |
| March 2024 | 33,202 |
| February 2024 | 37,752 |
| January 2024 | 30,769 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Palmas Wind, LLC plant, and when do they retire?
1 operable generator totals 145 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 145 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PW | Operating | Onshore Wind Turbine | 145 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Palmas Wind, LLC plant?
EIA lists no joint owners for Palmas Wind, LLC. Acciona Energy USA Global, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Palmas Wind, LLC plant?
Palmas Wind, LLC is in Rio Hondo, Cameron County, Texas, at 26.2889° N, 97.4964° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Palmas Wind, LLC's 145 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Blue Cloud Wind Energy LLC | Bailey | 148 | 564,040 |
| Cactus Flats Wind Energy Project | Concho | 148 | 439,139 |
| Ranchland Wind Project II | Callahan | 148 | 500,101 |
| Palmas Wind, LLC | Cameron | 145 | 362,544 |
| Panther Creek Wind Farm I | Howard | 143 | 529,689 |
| Pioneer Hutt Wind Energy | Midland | 140 | 609,363 |
| Blue Summit Wind LLC | Wilbarger | 135 | 491,750 |
Source: EIA Forms EIA-860 and EIA-923, 2025.