Wind power plant, Texas

Ranchland Wind Project II power plant, Texas

Ranchland Wind Project II is a 148 MW wind power plant in Callahan County, Texas, operated by Ranchland Wind Project II, LLC, and it generated 500,101 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 68th percentile of U.S. wind plants. By 2025 generation it ranks 1,340th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

148 MWNameplate capacity
39%Capacity factor, 2025, 68th percentile, on 148 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Ranchland Wind Project II plant run compared with other wind plants?

The Ranchland Wind Project II plant had a capacity factor of 39% in 2025 on 148 MW of net summer capacity, the 68th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 141 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ranchland Wind Project II39%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Ranchland Wind Project II plant generating more or less than last year?

Generation at Ranchland Wind Project II rose 0.6% from 2024 to 2025, from 496,954 MWh to 500,101 MWh. Through August 2026 it is running 8.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024496,954
2025500,101
2026 through August360,067
2025, same months331,645
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202641,198
July 202637,600
June 202649,116
May 202639,500
April 202649,730
March 202661,764
February 202639,373
January 202641,786
December 202548,363
November 202544,592
October 202546,430
September 202529,071
August 202529,794
July 202538,186
June 202542,400
May 202536,079
April 202550,345
March 202558,131
February 202537,717
January 202538,993
December 202439,121
November 202446,624
October 202445,096
September 202416,734
August 202435,453
July 202435,440
June 202443,664
May 202444,018
April 202452,887
March 202445,286
February 202452,741
January 202439,890

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Ranchland Wind Project II plant?

Ranchland Wind Project II made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 436th largest of 1,023 plants in Texas, the 2,093rd largest of 14,327 in the U.S. and the 497th largest of 1,358 wind plants. By 2025 generation it is the 284th largest of 816 generating plants in the state.

Ranchland Wind Project II within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)148195,9660.1%
Generation (MWh)500,101592,896,1760.1%
Wind capacity (MW)14843,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Ranchland Wind Project II plant, and when do they retire?

1 operable generator totals 148 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1148100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WT2OperatingOnshore Wind Turbine1482024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Ranchland Wind Project II plant?

EIA lists no joint owners for Ranchland Wind Project II. Ranchland Wind Project II, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Ranchland Wind Project II plant?

Ranchland Wind Project II is in Cisco, Callahan County, Texas, at 32.3085° N, 99.1642° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Ranchland Wind Project II's 148 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
RockspringsVal Verde149491,159
Blue Cloud Wind Energy LLCBailey148564,040
Cactus Flats Wind Energy ProjectConcho148439,139
Ranchland Wind Project IICallahan148500,101
Palmas Wind, LLCCameron145362,544
Panther Creek Wind Farm IHoward143529,689
Pioneer Hutt Wind EnergyMidland140609,363

Source: EIA Forms EIA-860 and EIA-923, 2025.