Valencia natural gas power plant, Arizona

Valencia is a 108 MW natural gas power plant in Santa Cruz County, Arizona, operated by UNS Electric, Inc, and it generated 6,779 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 11th percentile of U.S. natural gas plants. By 2025 generation it ranks 7,354th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

108 MWNameplate capacity
1%Capacity factor, 2025, 11th percentile, on 55.8 MW net summer
7,354thU.S. rank by generation, 2025
28 yearsAverage generator age, by MW

How hard does the Valencia plant run compared with other natural gas plants?

The Valencia plant had a capacity factor of 1% in 2025 on 55.8 MW of net summer capacity, the 11th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 5 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Valencia1%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Valencia plant generating more or less than last year?

Generation at Valencia rose 41.8% from 2024 to 2025, from 4,779 MWh to 6,779 MWh.

Net generation by period
PeriodMWh
20244,779
20256,779
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025465
November 2025480
October 2025634
September 2025756
August 2025858
July 2025771
June 2025631
May 2025523
April 2025437
March 2025308
February 2025382
January 2025533
December 2024382
November 2024346
October 2024491
September 2024477
August 2024563
July 2024573
June 2024454
May 2024337
April 2024303
March 2024264
February 2024267
January 2024322

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Valencia plant?

Valencia made 0.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.3% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 71st largest of 191 plants in Arizona, the 2,462nd largest of 14,327 in the U.S. and the 877th largest of 1,962 natural gas plants. By 2025 generation it is the 127th largest of 167 generating plants in the state.

Valencia within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)10840,5140.3%
Generation (MWh)6,779115,800,3780.0%
Natural gas capacity (MW)10817,3860.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Valencia plant, and when do they retire?

4 operable generators total 108 MW, with an average age of 28 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s35450%none reported
2000s15450%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GT1On standbyNatural Gas Fired Combustion Turbine181989n/a
GT2On standbyNatural Gas Fired Combustion Turbine181989n/a
GT3On standbyNatural Gas Fired Combustion Turbine181989n/a
GT4OperatingNatural Gas Fired Combustion Turbine542006n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Valencia plant?

EIA lists no joint owners for Valencia. UNS Electric, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does UNS Electric, Inc charge homes?

UNS Electric, Inc, the operator of Valencia, had an average residential price of 16.99¢ per kWh and an average bill of $144 a month in 2025, 11% above the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
UNS Electric, Inc16.99¢$14411% higher
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Valencia plant?

Valencia is in Nogales, Santa Cruz County, Arizona, at 31.3635° N, 110.9313° W. It sits in the Tucson Electric Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Arizona are similar in size?

Arizona has 33 operable natural gas plants with 17,386 MW of capacity, and Valencia's 108 MW is 1% of that.

Natural gas plants in Arizona around this size
PlantCountyMW2025 MWh
SaguaroPinal185117,510
Black Mountain Generating StationMohave12155,227
ValenciaSanta Cruz1086,301
North LoopPima1081,000
Copper Crossing Energy and Research CentPinal994,320
Demoss PetriePima852,071