Voyager Wind I power plant, California

Voyager Wind I is a 131 MW wind power plant in Kern County, California, operated by Terra-Gen Operating Co-Wind, and it generated 388,903 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 53rd percentile of U.S. wind plants. By 2025 generation it ranks 1,621st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

131 MWNameplate capacity
34%Capacity factor, 2025, 53rd percentile, on 131 MW net summer
0.2%Of CA generation, 2025
6 yearsAverage generator age, by MW

How hard does the Voyager Wind I plant run compared with other wind plants?

The Voyager Wind I plant had a capacity factor of 34% in 2025 on 131 MW of net summer capacity, the 53rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 124 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Voyager Wind I34%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Voyager Wind I plant generating more or less than last year?

Generation at Voyager Wind I fell 1.0% from 2024 to 2025, from 392,765 MWh to 388,903 MWh. Through August 2026 it is running 21.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024392,765
2025388,903
2026 through August249,561
2025, same months316,444
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202629,562
July 202631,461
June 202652,209
May 202642,822
April 202635,273
March 202634,551
February 202616,451
January 20267,232
December 202516,691
November 202513,452
October 202520,956
September 202521,360
August 202539,930
July 202544,653
June 202549,988
May 202552,989
April 202541,690
March 202539,389
February 202526,999
January 202520,806
December 202422,867
November 202424,777
October 202427,968
September 202428,176
August 202438,718
July 202436,459
June 202445,529
May 202447,551
April 202439,888
March 202433,515
February 202416,978
January 202430,339

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Voyager Wind I plant?

Voyager Wind I made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.6 times its share of capacity. By capacity it is the 214th largest of 1,877 plants in California, the 2,208th largest of 14,327 in the U.S. and the 531st largest of 1,358 wind plants. By 2025 generation it is the 117th largest of 1,608 generating plants in the state.

Voyager Wind I within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)131107,4330.1%
Generation (MWh)388,903204,542,8980.2%
Wind capacity (MW)1316,4792.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Voyager Wind I plant, and when do they retire?

1 operable generator totals 131 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1131100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
VYGR1OperatingOnshore Wind Turbine1312019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Voyager Wind I plant?

EIA lists no joint owners for Voyager Wind I. Terra-Gen Operating Co-Wind operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Voyager Wind I plant?

Voyager Wind I is in Mojave, Kern County, California, at 35.0461° N, 118.2827° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in California are similar in size?

California has 111 operable wind plants with 6,479 MW of capacity, and Voyager Wind I's 131 MW is 2% of that.

Wind plants in California around this size
PlantCountyMW2025 MWh
Alta Wind XKern138361,130
Pine Tree Wind Power ProjectKern135123,003
Pinyon Pine IIKern132204,303
Voyager Wind IKern131388,903
Voyager Wind IIKern129476,806
Windstar 1Kern120255,028
Shiloh III Wind Project LLCSolano103281,955