Battery and pumped storage power plant, Georgia
Wallace Dam, Georgia
Wallace Dam is a 321 MW power plant, 209 MW of it battery and pumped storage, in Hancock County, Georgia, operated by Georgia Power Co, and it generated 39,914 MWh in 2025 (Forms EIA-860 and EIA-923). By 2025 generation it ranks 4,366th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
Is the Wallace Dam plant generating more or less than last year?
Wallace Dam generated 39,914 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 125.1% behind the same months of 2025. 2024 has output for only 3 months, so the two years are not compared.
15 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 18,997 |
| 2025 | 39,914 |
| 2026 through August | -13,576 |
| 2025, same months | 54,081 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | -6,098 |
| July 2026 | -4,557 |
| June 2026 | -279 |
| May 2026 | 1,275 |
| April 2026 | -5,368 |
| March 2026 | 735 |
| February 2026 | 1,609 |
| January 2026 | -893 |
| December 2025 | -2,092 |
| November 2025 | -1,462 |
| October 2025 | -3,139 |
| September 2025 | -7,474 |
| August 2025 | 14,378 |
| July 2025 | -4,475 |
| June 2025 | 8,207 |
| May 2025 | 8,658 |
| April 2025 | 8,026 |
| March 2025 | 5,227 |
| February 2025 | 11,817 |
| January 2025 | 2,243 |
| December 2024 | -286 |
| November 2024 | -311 |
| October 2024 | -3,863 |
| September 2024 | 969 |
| August 2024 | -3,540 |
| July 2024 | 3,059 |
| June 2024 | -3,054 |
| May 2024 | 0 |
| April 2024 | 0 |
| March 2024 | 0 |
| February 2024 | 0 |
| January 2024 | 26,023 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Wallace Dam plant, and when do they retire?
6 operable generators total 321 MW, with an average age of 45 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 1 | 52 | 16% | none reported |
| 1980s | 5 | 269 | 84% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 6 | Operating | Hydroelectric Pumped Storage | 52 | 1979 | n/a |
| 1 | Operating | Hydroelectric Pumped Storage | 52 | 1980 | n/a |
| 2 | Operating | Hydroelectric Pumped Storage | 52 | 1980 | n/a |
| 3 | Operating | Conventional Hydroelectric | 56 | 1980 | n/a |
| 4 | Operating | Conventional Hydroelectric | 56 | 1980 | n/a |
| 5 | Operating | Hydroelectric Pumped Storage | 52 | 1980 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Wallace Dam plant?
EIA lists no joint owners for Wallace Dam. Georgia Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Georgia Power Co charge homes?
Georgia Power Co, the operator of Wallace Dam, had an average residential price of 16.28¢ per kWh and an average bill of $161 a month in 2025, 10% above the Georgia average of 14.74¢.
| Measure | Price | Monthly bill | Against Georgia |
|---|---|---|---|
| Georgia Power Co | 16.28¢ | $161 | 10% higher |
| Georgia average | 14.74¢ | $159 | |
| U.S. average | 17.23¢ | $151 | 17% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
What fuels does the Wallace Dam plant use?
Wallace Dam has capacity on 2 fuels: 65% battery and pumped storage and 35% hydro. In 2025, battery and pumped storage made -7% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Battery and pumped storage | 209 | 65.0% | -2,845 |
| Hydro | 112 | 35.0% | 42,759 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Wallace Dam plant?
Wallace Dam is in Eatonton, Hancock County, Georgia, at 33.3502° N, 83.1574° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which battery and pumped storage plants in Georgia are similar in size?
Georgia has 4 operable battery and pumped storage plants with 1,450 MW of capacity, and Wallace Dam's 209 MW is 14% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Richard B Russell | Elbert | 328 | -152,909 |
| Wallace Dam | Hancock | 209 | -2,845 |
Source: EIA Forms EIA-860 and EIA-923, 2025.