Natural gas power plant, Alabama

Washington County Cogeneration Facility, Alabama

Washington County Cogeneration Facility is a 123 MW natural gas power plant in Washington County, Alabama, operated by Alabama Power Co, and it generated 810,526 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Alabama, and its capacity factor sits at the 98th percentile of U.S. natural gas plants. By 2025 generation it ranks 867th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

123 MWNameplate capacity
93%Capacity factor, 2025, 98th percentile, on 100 MW net summer
0.6%Of AL generation, 2025
26 yearsAverage generator age, by MW

How hard does the Washington County Cogeneration Facility plant run compared with other natural gas plants?

The Washington County Cogeneration Facility plant had a capacity factor of 93% in 2025 on 100 MW of net summer capacity, the 98th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 338 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Washington County Cogeneration Facility93%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Washington County Cogeneration Facility plant generating more or less than last year?

Generation at Washington County Cogeneration Facility fell 1.9% from 2024 to 2025, from 825,864 MWh to 810,526 MWh.

Net generation by period
PeriodMWh
2024825,864
2025810,526
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202538,597
November 202567,046
October 202576,268
September 202554,016
August 202572,582
July 202572,183
June 202568,811
May 202564,577
April 202571,457
March 202575,470
February 202568,712
January 202580,807
December 202479,479
November 202425,419
October 202455,560
September 202471,651
August 202472,961
July 202473,563
June 202471,650
May 202474,540
April 202468,290
March 202478,050
February 202473,274
January 202481,427

Source: EIA Form EIA-923, through August 2026.

How much of Alabama's electricity comes from the Washington County Cogeneration Facility plant?

Washington County Cogeneration Facility made 0.6% of the 141,699,034 MWh reported by Alabama plants in 2025, from 0.4% of the state's 32,890 MW of capacity. Its share of output is 1.5 times its share of capacity. By capacity it is the 32nd largest of 78 plants in Alabama, the 2,289th largest of 14,327 in the U.S. and the 835th largest of 1,962 natural gas plants. By 2025 generation it is the 20th largest of 74 generating plants in the state.

Washington County Cogeneration Facility within Alabama, 2025
MeasureThis plantAlabamaShare
Capacity (MW)12332,8900.4%
Generation (MWh)810,526141,699,0340.6%
Natural gas capacity (MW)12317,4520.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Washington County Cogeneration Facility plant, and when do they retire?

2 operable generators total 123 MW, with an average age of 26 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s2123100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combined Cycle831999n/a
2OperatingNatural Gas Fired Combined Cycle401999n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Washington County Cogeneration Facility plant?

EIA lists no joint owners for Washington County Cogeneration Facility. Alabama Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Alabama Power Co charge homes?

Alabama Power Co, the operator of Washington County Cogeneration Facility, had an average residential price of 17.91¢ per kWh and an average bill of $202 a month in 2025, 11% above the Alabama average of 16.09¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Alabama
Alabama Power Co17.91¢$20211% higher
Alabama average16.09¢$184
U.S. average17.23¢$1517% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Washington County Cogeneration Facility plant?

Washington County Cogeneration Facility is in McIntosh, Washington County, Alabama, at 31.2642° N, 88.0027° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Alabama are similar in size?

Alabama has 26 operable natural gas plants with 17,452 MW of capacity, and Washington County Cogeneration Facility's 123 MW is 1% of that.

Natural gas plants in Alabama around this size
PlantCountyMW2025 MWh
Washington County Cogeneration FacilityWashington123810,526
Walton Discover Power FacilityLEE10357
AMEA PeakingTalladega9948,529
General Electric PlasticLowndes97521,698

Source: EIA Forms EIA-860 and EIA-923, 2025.