Skip to main content
RateWatt

Petroleum power plant, Iowa

Webster City petroleum power plant, Iowa

Webster City is a 21.3 MW petroleum power plant in Hamilton County, Iowa, operated by City of Webster City-(IA), and it generated 383 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 21st percentile of U.S. petroleum plants. By 2025 generation it ranks 12,208th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

21.3 MWNameplate capacity
under 1%Capacity factor, 2025, 21st percentile, on 20.7 MW net summer
12,208thU.S. rank by generation, 2025
53 yearsAverage generator age, by MW

How hard does the Webster City plant run compared with other petroleum plants?

The Webster City plant had a capacity factor of under 1% in 2025 on 20.7 MW of net summer capacity, the 21st percentile of the 143 U.S. petroleum plants with at least 20 MW. The typical petroleum plant reached 1%. It ran for only a few hours of the year at full output.

0%Shaded: the middle half of petroleum plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Webster Cityunder 1%
Petroleum plants, 75th percentile1%
Petroleum plants, median1%
Petroleum plants, 25th percentile0%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Webster City plant generating more or less than last year?

Generation at Webster City fell 52.7% from 2024 to 2025, from 809 MWh to 383 MWh.

Net generation by period
PeriodMWh
2024809
2025383
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202542
November 202526
October 202528
September 202528
August 202531
July 202527
June 202543
May 202515
April 202527
March 202535
February 202536
January 202545
December 202459
November 202463
October 202465
September 202443
August 202457
July 202447
June 202448
May 202470
April 202457
March 202471
February 202490
January 2024140

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Webster City plant?

Webster City made 0.0% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.1% of the state's 24,817 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 130th largest of 306 plants in Iowa, the 4,727th largest of 14,327 in the U.S. and the 171st largest of 861 petroleum plants. By 2025 generation it is the 205th largest of 283 generating plants in the state.

Webster City within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)2124,8170.1%
Generation (MWh)38374,502,3730.0%
Petroleum capacity (MW)218412.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Webster City plant, and when do they retire?

1 operable generator totals 21.3 MW, with an average age of 53 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s121100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
6OperatingPetroleum Liquids211972n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Webster City plant?

EIA lists no joint owners for Webster City. City of Webster City-(IA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Webster City charge homes?

City of Webster City, the operator of Webster City, had an average residential price of 13.06¢ per kWh and an average bill of $89 a month in 2019, 4% below the Iowa average of 13.62¢.

Average residential price and bill, 2019
MeasurePriceMonthly billAgainst Iowa
City of Webster City13.06¢$894% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2019. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Webster City plant?

Webster City is in Webster City, Hamilton County, Iowa, at 42.4710° N, 93.8150° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which petroleum plants in Iowa are similar in size?

Iowa has 88 operable petroleum plants with 841 MW of capacity, and Webster City's 21.3 MW is 3% of that.

Petroleum plants in Iowa around this size
PlantCountyMW2025 MWh
Spencer Gas TurbineClay2486
Forest City Light PlantWinnebago22392
Amana Society Service CompanyIowa221,403
Webster CityHamilton21383
ShenandoahPage20323
Waterloo LundquistBlack Hawk18255
Lake MillsWinnebago1899