Wellsburg Wind Project is a 141 MW wind power plant in Grundy County, Iowa, operated by MidAmerican Energy Co, and it generated 304,763 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Iowa, and its capacity factor sits at the 22nd percentile of U.S. wind plants. By 2025 generation it ranks 1,951st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

141 MWNameplate capacity
25%Capacity factor, 2025, 22nd percentile, on 139 MW net summer
0.4%Of IA generation, 2025
11 yearsAverage generator age, by MW

How hard does the Wellsburg Wind Project plant run compared with other wind plants?

The Wellsburg Wind Project plant had a capacity factor of 25% in 2025 on 139 MW of net summer capacity, the 22nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Wellsburg Wind Project25%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Wellsburg Wind Project plant generating more or less than last year?

Generation at Wellsburg Wind Project fell 35.0% from 2024 to 2025, from 468,726 MWh to 304,763 MWh.

Net generation by period
PeriodMWh
2024468,726
2025304,763
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202536,213
November 202522,490
October 202524,952
September 202517,478
August 202514,898
July 202516,695
June 202523,989
May 202520,522
April 202526,857
March 202531,878
February 202536,498
January 202532,293
December 202435,400
November 202443,285
October 202453,515
September 202427,396
August 202420,736
July 202414,498
June 202436,616
May 202435,969
April 202458,393
March 202458,275
February 202446,620
January 202438,023

Source: EIA Form EIA-923, through August 2026.

How much of Iowa's electricity comes from the Wellsburg Wind Project plant?

Wellsburg Wind Project made 0.4% of the 74,502,373 MWh reported by Iowa plants in 2025, from 0.6% of the state's 24,817 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 65th largest of 306 plants in Iowa, the 2,135th largest of 14,327 in the U.S. and the 513th largest of 1,358 wind plants. By 2025 generation it is the 65th largest of 283 generating plants in the state.

Wellsburg Wind Project within Iowa, 2025
MeasureThis plantIowaShare
Capacity (MW)14124,8170.6%
Generation (MWh)304,76374,502,3730.4%
Wind capacity (MW)14113,4101.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Wellsburg Wind Project plant, and when do they retire?

1 operable generator totals 141 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1141100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WBWFOperatingOnshore Wind Turbine1412014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Wellsburg Wind Project plant?

EIA lists no joint owners for Wellsburg Wind Project. MidAmerican Energy Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does MidAmerican Energy Co charge homes?

MidAmerican Energy Co, the operator of Wellsburg Wind Project, had an average residential price of 11.21¢ per kWh and an average bill of $93 a month in 2025, 18% below the Iowa average of 13.62¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Iowa
MidAmerican Energy Co11.21¢$9318% lower
Iowa average13.62¢$117
U.S. average17.23¢$15126% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Wellsburg Wind Project plant?

Wellsburg Wind Project is in Wellsburg, Grundy County, Iowa, at 42.3908° N, 92.9667° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Iowa are similar in size?

Iowa has 123 operable wind plants with 13,410 MW of capacity, and Wellsburg Wind Project's 141 MW is 1% of that.

Wind plants in Iowa around this size
PlantCountyMW2025 MWh
FPL Energy Crystal Lake Wind LLCHancock150584,739
FPL Energy Story Wind LLCStory150537,834
Garden Wind LLCHardin150375,166
Wellsburg Wind ProjectGrundy141304,763
Richland (IA)Sac131497,468
Laurel Wind FarmMarshall123469,972
Macksburg Wind ProjectMadison120248,695