Natural gas power plant, Nevada
Western 102 Power Plant, Nevada
Western 102 Power Plant is a 119 MW power plant, 118 MW of it natural gas, in Storey County, Nevada, operated by Nevada Gold Mines, and it generated 406,176 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in Nevada, and its capacity factor sits at the 64th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,571st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Western 102 Power Plant run compared with other natural gas plants?
Western 102 Power Plant's natural gas units had a capacity factor of 39% in 2025 on 119 MW of net summer capacity, the 64th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 142 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Western 102 Power Plant | 39% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.
Is Western 102 Power Plant generating more or less than last year?
Generation at Western 102 Power Plant fell 14.0% from 2024 to 2025, from 472,074 MWh to 406,176 MWh. Through August 2026 it is running 8.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 472,074 |
| 2025 | 406,176 |
| 2026 through August | 249,293 |
| 2025, same months | 270,985 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 32,050 |
| July 2026 | 33,018 |
| June 2026 | 42,144 |
| May 2026 | 38,421 |
| April 2026 | 36,602 |
| March 2026 | 36,584 |
| February 2026 | 18,249 |
| January 2026 | 12,225 |
| December 2025 | 20,744 |
| November 2025 | 39,415 |
| October 2025 | 37,161 |
| September 2025 | 37,871 |
| August 2025 | 31,110 |
| July 2025 | 42,835 |
| June 2025 | 33,893 |
| May 2025 | 28,338 |
| April 2025 | 38,603 |
| March 2025 | 28,968 |
| February 2025 | 36,561 |
| January 2025 | 30,677 |
| December 2024 | 27,383 |
| November 2024 | 30,006 |
| October 2024 | 38,712 |
| September 2024 | 49,115 |
| August 2024 | 55,424 |
| July 2024 | 43,492 |
| June 2024 | 43,398 |
| May 2024 | 23,054 |
| April 2024 | 35,842 |
| March 2024 | 33,514 |
| February 2024 | 41,032 |
| January 2024 | 51,102 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Western 102 Power Plant, and when do they retire?
15 operable generators total 119 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 15 | 119 | 100% | none reported |
Every generator, 15 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| A101 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| B102 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| B202 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| C102 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| C202 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| D101 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| E102 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| E202 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| F102 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| F202 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| G102 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| G202 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| H102 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| H202 | Operating | Natural Gas Internal Combustion Engine | 8 | 2005 | n/a |
| PV1 | Operating | Solar Photovoltaic | 1 | 2007 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Western 102 Power Plant?
EIA lists no joint owners for Western 102 Power Plant. Nevada Gold Mines operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does Western 102 Power Plant use?
Western 102 Power Plant has capacity on 2 fuels: 99% natural gas and 1% solar. In 2025, natural gas made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Natural gas | 118 | 99.2% | 404,839 |
| Solar | 1 | 0.8% | 1,337 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is Western 102 Power Plant?
Western 102 Power Plant is in McCarran, Storey County, Nevada, at 39.5603° N, 119.5108° W. It sits in the Nevada Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Nevada are similar in size?
Nevada has 16 operable natural gas plants with 8,821 MW of capacity, and Western 102 Power Plant's 118 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Fort Churchill | Lyon | 230 | 468,774 |
| Sun Peak Generating Station | Clark | 222 | 29,784 |
| Saguaro Power | Clark | 127 | 264,486 |
| Western 102 Power Plant | Storey | 118 | 404,839 |
| Nevada Cogen Associates 2 Black Mountain | Clark | 96 | 280,014 |
| Nevada Cogen Assoc#1 GarnetVly | Clark | 95 | 305,193 |
Source: EIA Forms EIA-860 and EIA-923, 2025.