Biomass power plant, Texas
WestRock biomass power plant, Texas
WestRock (TX) is a 57.7 MW biomass power plant in Jasper County, Texas, operated by WestRock (TX), and it generated 441,162 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 79th percentile of U.S. biomass plants. By 2025 generation it ranks 1,482nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the WestRock (TX) plant run compared with other biomass plants?
The WestRock (TX) plant had a capacity factor of 67% in 2025 on 59.5 MW of net summer capacity, the 79th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 245 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| WestRock (TX) | 67% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the WestRock (TX) plant generating more or less than last year?
Generation at WestRock (TX) rose 6.3% from 2024 to 2025, from 415,158 MWh to 441,162 MWh.
| Period | MWh |
|---|---|
| 2024 | 415,158 |
| 2025 | 441,162 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 35,915 |
| November 2025 | 29,576 |
| October 2025 | 40,230 |
| September 2025 | 39,490 |
| August 2025 | 37,664 |
| July 2025 | 37,867 |
| June 2025 | 37,060 |
| May 2025 | 37,302 |
| April 2025 | 37,239 |
| March 2025 | 40,296 |
| February 2025 | 31,944 |
| January 2025 | 36,579 |
| December 2024 | 37,631 |
| November 2024 | 38,125 |
| October 2024 | 37,230 |
| September 2024 | 38,369 |
| August 2024 | 35,792 |
| July 2024 | 37,841 |
| June 2024 | 36,042 |
| May 2024 | 21,838 |
| April 2024 | 25,884 |
| March 2024 | 33,693 |
| February 2024 | 34,024 |
| January 2024 | 38,689 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the WestRock (TX) plant, and when do they retire?
3 operable generators total 57.7 MW, with an average age of 55 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1950s | 1 | 8 | 13% | none reported |
| 1960s | 1 | 33 | 56% | none reported |
| 1980s | 1 | 18 | 31% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Wood/Wood Waste Biomass | 8 | 1954 | n/a |
| GEN2 | Operating | Wood/Wood Waste Biomass | 33 | 1965 | n/a |
| GEN3 | Operating | Wood/Wood Waste Biomass | 18 | 1986 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the WestRock (TX) plant?
EIA lists no joint owners for WestRock (TX). WestRock (TX) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the WestRock (TX) plant?
WestRock (TX) is in Evadale, Jasper County, Texas, at 30.3419° N, 94.0656° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in Texas are similar in size?
Texas has 12 operable biomass plants with 363 MW of capacity, and WestRock (TX)'s 57.7 MW is 16% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Nacogdoches Power | Nacogdoches | 114 | 250,745 |
| International Paper Texarkana Mill | Cass | 65 | 284,537 |
| WestRock (TX) | Jasper | 58 | 349,923 |
| Woodville Renewable Power Project | Tyler | 50 | n/a |
| USG Paper, LLC - Orange Mill | Orange | 48 | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.