Skip to main content
RateWatt

Biomass power plant, Texas

Nacogdoches Power biomass power plant, Texas

Nacogdoches Power is a 114 MW biomass power plant in Nacogdoches County, Texas, operated by Austin Energy, and it generated 250,745 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 17th percentile of U.S. biomass plants. By 2025 generation it ranks 2,230th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

114 MWNameplate capacity
29%Capacity factor, 2025, 17th percentile, on 100 MW net summer
2,230thU.S. rank by generation, 2025
13 yearsAverage generator age, by MW

How hard does the Nacogdoches Power plant run compared with other biomass plants?

The Nacogdoches Power plant had a capacity factor of 29% in 2025 on 100 MW of net summer capacity, the 17th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 104 days at full output out of 365.

0%Shaded: the middle half of biomass plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Nacogdoches Power29%
Biomass plants, 75th percentile65%
Biomass plants, median48%
Biomass plants, 25th percentile35%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Nacogdoches Power plant generating more or less than last year?

Nacogdoches Power generated 250,745 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 115.9% ahead of the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024190,028
2025250,745
2026 through August270,787
2025, same months125,399
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202643,783
July 202639,709
June 202640,436
May 202639,766
April 20260
March 202625,565
February 202635,871
January 202645,657
December 202545,089
November 202513,937
October 202526,960
September 202539,360
August 202542,684
July 202524,602
June 202517,915
May 20253,748
April 20250
March 20250
February 202510,253
January 202526,197
December 202420,956
November 20240
October 20249,682
September 20240
August 202430,005
July 202423,453
June 202445,978
May 202424,513
April 20240
March 20240
February 20242,202
January 202433,239

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Nacogdoches Power plant?

Nacogdoches Power made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 479th largest of 1,023 plants in Texas, the 2,396th largest of 14,327 in the U.S. and the 9th largest of 585 biomass plants. By 2025 generation it is the 422nd largest of 816 generating plants in the state.

Nacogdoches Power within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)114195,9660.1%
Generation (MWh)250,745592,896,1760.0%
Biomass capacity (MW)11436331.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Nacogdoches Power plant, and when do they retire?

1 operable generator totals 114 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1114100%none reported
Every generator, 7 in all
UnitStatusTechnologyMWIn servicePlanned retirement
STG4OperatingWood/Wood Waste Biomass1142012n/a
CTG1CancelledNatural Gas Fired Combined Cycle195n/an/a
CTG2CancelledNatural Gas Fired Combined Cycle190n/an/a
CTG3CancelledNatural Gas Fired Combined Cycle190n/an/a
STG1CancelledNatural Gas Fired Combined Cycle100n/an/a
STG2CancelledNatural Gas Fired Combined Cycle114n/an/a
STG3CancelledNatural Gas Fired Combined Cycle136n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Nacogdoches Power plant?

EIA lists no joint owners for Nacogdoches Power. Austin Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Austin Energy charge homes?

Austin Energy, the operator of Nacogdoches Power, had an average residential price of 13.14¢ per kWh and an average bill of $110 a month in 2025, 15% below the Texas average of 15.40¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Texas
Austin Energy13.14¢$11015% lower
Texas average15.40¢$171
U.S. average17.23¢$15112% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Nacogdoches Power plant?

Nacogdoches Power is in Cushing, Nacogdoches County, Texas, at 31.8321° N, 94.9006° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which biomass plants in Texas are similar in size?

Texas has 12 operable biomass plants with 363 MW of capacity, and Nacogdoches Power's 114 MW is 31% of that.

Biomass plants in Texas around this size
PlantCountyMW2025 MWh
Nacogdoches PowerNacogdoches114250,745
International Paper Texarkana MillCass65284,537
WestRock (TX)Jasper58349,923

Source: EIA Forms EIA-860 and EIA-923, 2025.