Wind power plant, Texas
Windthorst-2 wind power plant, Texas
Windthorst-2 is a 67.6 MW wind power plant in Archer County, Texas, operated by EDF Renewable Asset Holdings, Inc., and it generated 181,550 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 42nd percentile of U.S. wind plants. By 2025 generation it ranks 2,627th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Windthorst-2 plant run compared with other wind plants?
The Windthorst-2 plant had a capacity factor of 31% in 2025 on 67.6 MW of net summer capacity, the 42nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 112 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Windthorst-2 | 31% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Windthorst-2 plant generating more or less than last year?
Windthorst-2 generated 181,550 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 10 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 169,490 |
| 2025 | 181,550 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 13,162 |
| November 2025 | 13,595 |
| October 2025 | 16,261 |
| September 2025 | 12,819 |
| August 2025 | 12,095 |
| July 2025 | 15,141 |
| June 2025 | 18,023 |
| May 2025 | 15,691 |
| April 2025 | 13,357 |
| March 2025 | 19,767 |
| February 2025 | 16,162 |
| January 2025 | 15,477 |
| December 2024 | 0 |
| November 2024 | 0 |
| October 2024 | 17,481 |
| September 2024 | 9,733 |
| August 2024 | 14,397 |
| July 2024 | 13,758 |
| June 2024 | 16,777 |
| May 2024 | 17,641 |
| April 2024 | 22,777 |
| March 2024 | 21,356 |
| February 2024 | 20,577 |
| January 2024 | 14,993 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Windthorst-2 plant, and when do they retire?
1 operable generator totals 67.6 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 68 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WND2 | Operating | Onshore Wind Turbine | 68 | 2014 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Windthorst-2 plant?
2 owners report shares in Windthorst-2; RPG Windthorst-2 Investco holds the largest named share, 99.8% or about 67.4 MW. EDF Renewable Asset Holdings, Inc. operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| RPG Windthorst-2 Investco | 99.8% | 67 | 181,096 |
| Windthorst-2 LLC | 0.3% | 0 | 454 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Windthorst-2 plant?
Windthorst-2 is in Archer, Archer County, Texas, at 33.4953° N, 98.5000° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Windthorst-2's 67.6 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Golden Spread Panhandle Wnd Rch | Oldham | 78 | 196,787 |
| Woodward Mountain II | Pecos | 78 | 132,453 |
| Sendero | Jim Hogg | 78 | 274,340 |
| Windthorst-2 | Archer | 68 | 181,550 |
| Cirrus Wind 1 LLC | Lynn | 61 | n/a |
| Whirlwind Energy Center | Floyd | 60 | 89,669 |
| Ocotillo Windpower | Howard | 59 | 79,406 |
Source: EIA Forms EIA-860 and EIA-923, 2025.