Skip to main content
RateWatt

Solar power plant, Arizona

Agave solar power plant, Arizona

Agave is a 150 MW solar power plant in Maricopa County, Arizona, operated by Arizona Public Service Co, and it generated 297,844 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Arizona, and its capacity factor sits at the 46th percentile of U.S. solar plants. By 2025 generation it ranks 1,984th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
23%Capacity factor, 2025, 46th percentile, on 150 MW net summer
0.3%Of AZ generation, 2025
2 yearsAverage generator age, by MW

How hard does the Agave plant run compared with other solar plants?

The Agave plant had a capacity factor of 23% in 2025 on 150 MW of net summer capacity, the 46th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Agave23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Agave plant generating more or less than last year?

Agave generated 297,844 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 6.2% ahead of the same months of 2025. 2024 has output for only 4 months, so the two years are not compared.

Net generation by period
PeriodMWh
202498,893
2025297,844
2026 through August263,059
2025, same months247,650
Monthly generation, Sep 2024 to Aug 2026
MonthMWh
August 202637,268
July 202643,042
June 202635,894
May 202640,973
April 202640,361
March 202623,632
February 202624,509
January 202617,380
December 20250
November 20250
October 202523,689
September 202526,505
August 202540,175
July 202530,526
June 202539,673
May 202527,935
April 202536,960
March 202530,643
February 202522,768
January 202518,970
December 202422,608
November 202425,979
October 202411,054
September 202439,252

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Agave plant?

Agave made 0.3% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.4% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 60th largest of 191 plants in Arizona, the 1,967th largest of 14,327 in the U.S. and the 302nd largest of 7,223 solar plants. By 2025 generation it is the 50th largest of 167 generating plants in the state.

Agave within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)15040,5140.4%
Generation (MWh)297,844115,800,3780.3%
Solar capacity (MW)1506,6722.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Agave plant, and when do they retire?

1 operable generator totals 150 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 150 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1150100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
A150MOperatingSolar Photovoltaic1502023n/a
A400MBuilt, not yet operatingBatteries1502026n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Agave plant?

EIA lists no joint owners for Agave. Arizona Public Service Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Arizona Public Service Co charge homes?

Arizona Public Service Co, the operator of Agave, had an average residential price of 17.03¢ per kWh and an average bill of $165 a month in 2025, 12% above the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
Arizona Public Service Co17.03¢$16512% higher
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Agave plant?

Agave is in Arlington, Maricopa County, Arizona, at 33.3239° N, 112.8397° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Agave's 150 MW is 2% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Mesquite Solar 3, LLCMaricopa150443,395
Sun Streams 2Maricopa150328,214
Harquahala Sun Solar ProjectMaricopa150316,758
AgaveMaricopa150297,844
Wilmot Energy Center LLCPima130271,021
Arlington Valley Solar Energy IIMaricopa129335,989
Storey Solar and StoragePinal122314,336

Source: EIA Forms EIA-860 and EIA-923, 2025.