Solar power plant, Arizona
Storey Solar and Storage power plant, Arizona
Storey Solar and Storage is a 210 MW power plant, 122 MW of it solar, in Pinal County, Arizona, operated by Storey Energy Center, LLC, and it generated 300,787 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Arizona, and its capacity factor sits at the 100th percentile of U.S. solar plants. By 2025 generation it ranks 1,968th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Storey Solar and Storage plant run compared with other solar plants?
The Storey Solar and Storage plant's solar units had a capacity factor of 41% in 2025 on 88 MW of net summer capacity, the 100th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 149 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Storey Solar and Storage | 41% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Storey Solar and Storage plant generating more or less than last year?
Generation at Storey Solar and Storage rose 2.7% from 2024 to 2025, from 292,972 MWh to 300,787 MWh. Through August 2026 it is running 1.2% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 292,972 |
| 2025 | 300,787 |
| 2026 through August | 219,090 |
| 2025, same months | 221,723 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 27,425 |
| July 2026 | 29,908 |
| June 2026 | 33,344 |
| May 2026 | 34,285 |
| April 2026 | 29,441 |
| March 2026 | 27,906 |
| February 2026 | 19,216 |
| January 2026 | 17,565 |
| December 2025 | 16,428 |
| November 2025 | 17,064 |
| October 2025 | 22,557 |
| September 2025 | 23,015 |
| August 2025 | 26,480 |
| July 2025 | 31,194 |
| June 2025 | 34,322 |
| May 2025 | 33,400 |
| April 2025 | 31,837 |
| March 2025 | 26,545 |
| February 2025 | 20,925 |
| January 2025 | 17,020 |
| December 2024 | 15,481 |
| November 2024 | 16,145 |
| October 2024 | 22,305 |
| September 2024 | 26,230 |
| August 2024 | 28,200 |
| July 2024 | 28,005 |
| June 2024 | 26,808 |
| May 2024 | 35,984 |
| April 2024 | 33,631 |
| March 2024 | 26,839 |
| February 2024 | 10,370 |
| January 2024 | 22,974 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Storey Solar and Storage plant, and when do they retire?
2 operable generators total 210 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 210 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| STOBA | Operating | Batteries | 88 | 2023 | n/a |
| STORY | Operating | Solar Photovoltaic | 122 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Storey Solar and Storage plant?
EIA lists no joint owners for Storey Solar and Storage. Storey Energy Center, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Storey Solar and Storage plant use?
Storey Solar and Storage has capacity on 2 fuels: 58% solar and 42% battery and pumped storage. In 2025, solar made 105% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 122 | 58.1% | 314,336 |
| Battery and pumped storage | 88 | 41.9% | -13,549 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Storey Solar and Storage plant?
Storey Solar and Storage is in Coolidge, Pinal County, Arizona, at 32.8882° N, 111.4978° W. It sits in the Salt River Project balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arizona are similar in size?
Arizona has 111 operable solar plants with 6,672 MW of capacity, and Storey Solar and Storage's 122 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Agave | Maricopa | 150 | 297,844 |
| Wilmot Energy Center LLC | Pima | 130 | 271,021 |
| Arlington Valley Solar Energy II | Maricopa | 129 | 335,989 |
| Storey Solar and Storage | Pinal | 122 | 314,336 |
| Mesquite Solar 2, LLC | Maricopa | 100 | 285,509 |
| East Line Solar | Pinal | 100 | 254,630 |
| Saint Solar | Pinal | 100 | 284,069 |
Source: EIA Forms EIA-860 and EIA-923, 2025.