Skip to main content
RateWatt

Solar power plant, Arizona

Mesquite Solar 2, LLC power plant, Arizona

Mesquite Solar 2, LLC is a 100 MW solar power plant in Maricopa County, Arizona, operated by RWE Clean Energy, and it generated 285,509 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Arizona, and its capacity factor sits at the 97th percentile of U.S. solar plants. By 2025 generation it ranks 2,038th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
33%Capacity factor, 2025, 97th percentile, on 100 MW net summer
0.2%Of AZ generation, 2025
9 yearsAverage generator age, by MW

How hard does the Mesquite Solar 2, LLC plant run compared with other solar plants?

The Mesquite Solar 2, LLC plant had a capacity factor of 33% in 2025 on 100 MW of net summer capacity, the 97th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 119 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mesquite Solar 2, LLC33%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mesquite Solar 2, LLC plant generating more or less than last year?

Generation at Mesquite Solar 2, LLC rose 3.2% from 2024 to 2025, from 276,649 MWh to 285,509 MWh. Through August 2026 it is running 5.2% behind the same months of 2025. Only 7 months of 2026 have been reported for this plant.

Net generation by period
PeriodMWh
2024276,649
2025285,509
2026 through August169,393
2025, same months178,761
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202628,479
July 202625,835
June 202629,307
May 202628,759
March 202623,085
February 202617,921
January 202616,007
December 202515,220
November 202516,482
October 202522,549
September 202524,115
August 202528,881
July 202531,403
June 202532,301
May 202530,542
April 202528,382
March 202524,333
February 202513,994
January 202517,307
December 202415,737
November 202418,329
October 202423,586
September 202426,980
August 202428,494
July 202430,613
June 202431,239
May 202433,278
April 202429,487
March 202413,590
February 202412,484
January 202412,832

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Mesquite Solar 2, LLC plant?

Mesquite Solar 2, LLC made 0.2% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.2% of the state's 40,514 MW of capacity. By capacity it is the 73rd largest of 191 plants in Arizona, the 2,602nd largest of 14,327 in the U.S. and the 435th largest of 7,223 solar plants. By 2025 generation it is the 51st largest of 167 generating plants in the state.

Mesquite Solar 2, LLC within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)10040,5140.2%
Generation (MWh)285,509115,800,3780.2%
Solar capacity (MW)1006,6721.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mesquite Solar 2, LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic1002016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mesquite Solar 2, LLC plant?

EIA lists no joint owners for Mesquite Solar 2, LLC. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Mesquite Solar 2, LLC plant?

Mesquite Solar 2, LLC is in Tonopah, Maricopa County, Arizona, at 33.3328° N, 112.9114° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Mesquite Solar 2, LLC's 100 MW is 1% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Wilmot Energy Center LLCPima130271,021
Arlington Valley Solar Energy IIMaricopa129335,989
Storey Solar and StoragePinal122314,336
Mesquite Solar 2, LLCMaricopa100285,509
East Line SolarPinal100254,630
Saint SolarPinal100284,069
Central Line Solar, LLCPinal100269,357

Source: EIA Forms EIA-860 and EIA-923, 2025.