East Line Solar is a 100 MW solar power plant in Pinal County, Arizona, operated by AES Distributed Energy, and it generated 254,630 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Arizona, and its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 2,201st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
29%Capacity factor, 2025, 87th percentile, on 100 MW net summer
0.2%Of AZ generation, 2025
5 yearsAverage generator age, by MW

How hard does the East Line Solar plant run compared with other solar plants?

The East Line Solar plant had a capacity factor of 29% in 2025 on 100 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
East Line Solar29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the East Line Solar plant generating more or less than last year?

Generation at East Line Solar rose 6.5% from 2024 to 2025, from 239,103 MWh to 254,630 MWh. Through August 2026 it is running 13.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024239,103
2025254,630
2026 through August162,101
2025, same months186,310
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202624,398
July 202625,791
June 202627,714
May 202623,128
April 202615,887
March 202617,394
February 202614,615
January 202613,174
December 202512,999
November 202514,011
October 202519,358
September 202521,952
August 202525,396
July 202527,239
June 202528,993
May 202525,169
April 202526,069
March 202522,281
February 202516,744
January 202514,419
December 202413,005
November 202413,983
October 202417,685
September 202420,710
August 202422,090
July 202426,200
June 202425,879
May 202430,214
April 202427,067
March 202420,002
February 202413,839
January 20248,429

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the East Line Solar plant?

East Line Solar made 0.2% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.2% of the state's 40,514 MW of capacity. By capacity it is the 73rd largest of 191 plants in Arizona, the 2,602nd largest of 14,327 in the U.S. and the 447th largest of 7,223 solar plants. By 2025 generation it is the 56th largest of 167 generating plants in the state.

East Line Solar within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)10040,5140.2%
Generation (MWh)254,630115,800,3780.2%
Solar capacity (MW)1006,6721.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the East Line Solar plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
EASTLOperatingSolar Photovoltaic1002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the East Line Solar plant?

EIA lists no joint owners for East Line Solar. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the East Line Solar plant?

East Line Solar is in Coolidge, Pinal County, Arizona, at 32.8470° N, 111.5651° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and East Line Solar's 100 MW is 1% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Arlington Valley Solar Energy IIMaricopa129335,989
Storey Solar and StoragePinal122314,336
Mesquite Solar 2, LLCMaricopa100285,509
East Line SolarPinal100254,630
Saint SolarPinal100284,069
Central Line Solar, LLCPinal100269,357
West Line Solar, LLCPinal100258,633

Source: EIA Forms EIA-860 and EIA-923, 2025.