Central Line Solar, LLC is a 100 MW solar power plant in Pinal County, Arizona, operated by AES Distributed Energy, and it generated 269,357 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Arizona, and its capacity factor sits at the 94th percentile of U.S. solar plants. By 2025 generation it ranks 2,118th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
31%Capacity factor, 2025, 94th percentile, on 100 MW net summer
0.2%Of AZ generation, 2025
3 yearsAverage generator age, by MW

How hard does the Central Line Solar, LLC plant run compared with other solar plants?

The Central Line Solar, LLC plant had a capacity factor of 31% in 2025 on 100 MW of net summer capacity, the 94th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 112 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Central Line Solar, LLC31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Central Line Solar, LLC plant generating more or less than last year?

Generation at Central Line Solar, LLC rose 1.1% from 2024 to 2025, from 266,502 MWh to 269,357 MWh. Through August 2026 it is running 11.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024266,502
2025269,357
2026 through August175,947
2025, same months197,724
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202625,052
July 202627,517
June 202630,134
May 202626,214
April 202618,163
March 202619,001
February 202615,388
January 202614,478
December 202513,639
November 202514,871
October 202520,627
September 202522,496
August 202525,543
July 202527,167
June 202530,519
May 202530,407
April 202528,085
March 202523,936
February 202517,172
January 202514,895
December 202413,859
November 202415,659
October 202421,293
September 202425,630
August 202426,770
July 202429,517
June 202428,287
May 202432,419
April 202429,659
March 202420,958
February 202414,346
January 20248,105

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Central Line Solar, LLC plant?

Central Line Solar, LLC made 0.2% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.2% of the state's 40,514 MW of capacity. By capacity it is the 73rd largest of 191 plants in Arizona, the 2,602nd largest of 14,327 in the U.S. and the 464th largest of 7,223 solar plants. By 2025 generation it is the 53rd largest of 167 generating plants in the state.

Central Line Solar, LLC within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)10040,5140.2%
Generation (MWh)269,357115,800,3780.2%
Solar capacity (MW)1006,6721.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Central Line Solar, LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CNTRLOperatingSolar Photovoltaic1002022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Central Line Solar, LLC plant?

EIA lists no joint owners for Central Line Solar, LLC. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Central Line Solar, LLC plant?

Central Line Solar, LLC is in Coolidge, Pinal County, Arizona, at 32.8343° N, 111.5680° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Central Line Solar, LLC's 100 MW is 1% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Mesquite Solar 2, LLCMaricopa100285,509
East Line SolarPinal100254,630
Saint SolarPinal100284,069
Central Line Solar, LLCPinal100269,357
West Line Solar, LLCPinal100258,633
Yuma Solar + StorageYuma70169,606
Mesquite Solar 5, LLCMaricopa60143,619