Skip to main content
RateWatt

Solar power plant, Arizona

Mesquite Solar 5, LLC power plant, Arizona

Mesquite Solar 5, LLC is a 120 MW power plant, 60 MW of it solar, in Maricopa County, Arizona, operated by RWE Clean Energy, and it generated 134,381 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 79th percentile of U.S. solar plants. By 2025 generation it ranks 3,069th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

120 MWNameplate capacity
27%Capacity factor, 2025, solar units, 79th percentile, on 60 MW net summer
0.1%Of AZ generation, 2025
2 yearsAverage generator age, by MW

How hard does the Mesquite Solar 5, LLC plant run compared with other solar plants?

The Mesquite Solar 5, LLC plant's solar units had a capacity factor of 27% in 2025 on 60 MW of net summer capacity, the 79th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mesquite Solar 5, LLC27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Mesquite Solar 5, LLC plant generating more or less than last year?

Generation at Mesquite Solar 5, LLC rose 14.8% from 2024 to 2025, from 117,033 MWh to 134,381 MWh. Through August 2026 it is running 14.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024117,033
2025134,381
2026 through August80,775
2025, same months94,002
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,742
July 202615,835
June 202612,985
May 20267,523
April 20267,428
March 20267,656
February 20266,328
January 20268,278
December 20257,444
November 20258,391
October 202511,834
September 202512,710
August 202516,285
July 202518,034
June 202517,191
May 202512,284
April 202510,477
March 20258,248
February 20253,714
January 20257,769
December 20247,998
November 20247,804
October 202412,236
September 202414,075
August 202415,622
July 202416,717
June 202414,174
May 20248,398
April 20244,186
March 20243,967
February 20244,479
January 20247,377

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Mesquite Solar 5, LLC plant?

Mesquite Solar 5, LLC made 0.1% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.3% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 69th largest of 191 plants in Arizona, the 2,315th largest of 14,327 in the U.S. and the 816th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 65th largest of 167 generating plants in the state.

Mesquite Solar 5, LLC within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)12040,5140.3%
Generation (MWh)134,381115,800,3780.1%
Solar capacity (MW)606,6720.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mesquite Solar 5, LLC plant, and when do they retire?

2 operable generators total 120 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2120100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MS5OperatingSolar Photovoltaic602023n/a
MS5BOperatingBatteries602023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mesquite Solar 5, LLC plant?

EIA lists no joint owners for Mesquite Solar 5, LLC. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Mesquite Solar 5, LLC plant use?

Mesquite Solar 5, LLC has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 107% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar6050.0%143,619
Battery and pumped storage6050.0%-9,238

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Mesquite Solar 5, LLC plant?

Mesquite Solar 5, LLC is in Tonopah, Maricopa County, Arizona, at 33.3252° N, 112.9180° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Mesquite Solar 5, LLC's 60 MW is 1% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Central Line Solar, LLCPinal100269,357
West Line Solar, LLCPinal100258,633
Yuma Solar + StorageYuma70169,606
Mesquite Solar 5, LLCMaricopa60143,619
Kayenta Solar ProjectNavajo55121,046
Gray Hawk SolarMohave55136,815
Mesquite Solar 4, LLCMaricopa53145,865

Source: EIA Forms EIA-860 and EIA-923, 2025.