Mesquite Solar 4, LLC is a 62.5 MW power plant, 52.5 MW of it solar, in Maricopa County, Arizona, operated by RWE Clean Energy, and it generated 144,447 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 2,961st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

62.5 MWNameplate capacity
32%Capacity factor, 2025, solar units, 96th percentile, on 52.5 MW net summer
0.1%Of AZ generation, 2025
1 yearAverage generator age, by MW

How hard does the Mesquite Solar 4, LLC plant run compared with other solar plants?

The Mesquite Solar 4, LLC plant's solar units had a capacity factor of 32% in 2025 on 52.5 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 116 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mesquite Solar 4, LLC32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Mesquite Solar 4, LLC plant generating more or less than last year?

Generation at Mesquite Solar 4, LLC fell 1.6% from 2024 to 2025, from 146,810 MWh to 144,447 MWh. Through August 2026 it is running 10.1% behind the same months of 2025.

Net generation by period
PeriodMWh
2024146,810
2025144,447
2026 through August95,799
2025, same months106,609
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20268,385
July 202614,121
June 202615,114
May 202615,839
April 202612,409
March 202612,901
February 20268,951
January 20268,079
December 20257,436
November 20257,603
October 202511,032
September 202511,767
August 202514,358
July 202515,340
June 202516,430
May 202515,423
April 202513,970
March 202512,830
February 20259,416
January 20258,842
December 20248,003
November 20249,337
October 202411,968
September 202413,926
August 202414,460
July 202415,838
June 202415,632
May 202415,118
April 202415,572
March 202411,952
February 20247,845
January 20247,159

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Mesquite Solar 4, LLC plant?

Mesquite Solar 4, LLC made 0.1% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.2% of the state's 40,514 MW of capacity. By capacity it is the 93rd largest of 191 plants in Arizona, the 3,469th largest of 14,327 in the U.S. and the 847th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 62nd largest of 167 generating plants in the state.

Mesquite Solar 4, LLC within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)6340,5140.2%
Generation (MWh)144,447115,800,3780.1%
Solar capacity (MW)536,6720.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mesquite Solar 4, LLC plant, and when do they retire?

2 operable generators total 62.5 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s263100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MS4OperatingSolar Photovoltaic532024n/a
MS4BOperatingBatteries102024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mesquite Solar 4, LLC plant?

EIA lists no joint owners for Mesquite Solar 4, LLC. RWE Clean Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Mesquite Solar 4, LLC plant use?

Mesquite Solar 4, LLC has capacity on 2 fuels: 84% solar and 16% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar5384.0%145,865
Battery and pumped storage1016.0%-1,418

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Mesquite Solar 4, LLC plant?

Mesquite Solar 4, LLC is in Tonopah, Maricopa County, Arizona, at 33.3265° N, 112.9189° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Mesquite Solar 4, LLC's 52.5 MW is 1% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Mesquite Solar 5, LLCMaricopa60143,619
Kayenta Solar ProjectNavajo55121,046
Gray Hawk SolarMohave55136,815
Mesquite Solar 4, LLCMaricopa53145,865
Red Horse 2Cochise51102,027
Bonnybrooke PVPinal5090,825
Sandstone SolarPinal45116,882

Source: EIA Forms EIA-860 and EIA-923, 2025.