Solar power plant, Arizona

Kayenta Solar Project, Arizona

Kayenta Solar Project is a 55.3 MW solar power plant in Navajo County, Arizona, operated by NGI-Kayenta Solar Lessor I, LLC, and it generated 121,046 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 3,183rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

55.3 MWNameplate capacity
25%Capacity factor, 2025, 64th percentile, on 55.3 MW net summer
0.1%Of AZ generation, 2025
7 yearsAverage generator age, by MW

How hard does the Kayenta Solar Project plant run compared with other solar plants?

The Kayenta Solar Project plant had a capacity factor of 25% in 2025 on 55.3 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Kayenta Solar Project25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Kayenta Solar Project plant generating more or less than last year?

Generation at Kayenta Solar Project rose 38.3% from 2024 to 2025, from 87,547 MWh to 121,046 MWh. Through August 2026 it is running 1.7% behind the same months of 2025.

Net generation by period
PeriodMWh
202487,547
2025121,046
2026 through August88,203
2025, same months89,764
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202610,962
July 202611,706
June 202613,277
May 202613,856
April 202612,374
March 202611,742
February 20267,654
January 20266,632
December 20255,728
November 20256,511
October 20259,360
September 20259,683
August 202511,659
July 202512,339
June 202513,414
May 202514,165
April 202512,780
March 202510,684
February 20258,104
January 20256,619
December 20246,157
November 20246,131
October 20245,497
September 20247,416
August 20248,377
July 20248,788
June 20249,258
May 202410,902
April 20248,462
March 20247,354
February 20244,839
January 20244,366

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Kayenta Solar Project plant?

Kayenta Solar Project made 0.1% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 94th largest of 191 plants in Arizona, the 3,629th largest of 14,327 in the U.S. and the 833rd largest of 7,223 solar plants. By 2025 generation it is the 66th largest of 167 generating plants in the state.

Kayenta Solar Project within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)5540,5140.1%
Generation (MWh)121,046115,800,3780.1%
Solar capacity (MW)556,6720.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Kayenta Solar Project plant, and when do they retire?

2 operable generators total 55.3 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s255100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic272017n/a
PV2OperatingSolar Photovoltaic282019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Kayenta Solar Project plant?

EIA lists no joint owners for Kayenta Solar Project. NGI-Kayenta Solar Lessor I, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Kayenta Solar Project plant?

Kayenta Solar Project is in Kayenta, Navajo County, Arizona, at 36.7719° N, 110.2639° W. It sits in the Western Area Power Administration - Desert Southwest Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Kayenta Solar Project's 55.3 MW is 1% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
West Line Solar, LLCPinal100258,633
Yuma Solar + StorageYuma70169,606
Mesquite Solar 5, LLCMaricopa60143,619
Kayenta Solar ProjectNavajo55121,046
Gray Hawk SolarMohave55136,815
Mesquite Solar 4, LLCMaricopa53145,865
Red Horse 2Cochise51102,027

Source: EIA Forms EIA-860 and EIA-923, 2025.