Solar power plant, Arizona
Red Horse 2 solar power plant, Arizona
Red Horse 2 is a 81 MW power plant, 51 MW of it solar, in Cochise County, Arizona, operated by Red Horse 2, and it generated 144,209 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 48th percentile of U.S. solar plants. By 2025 generation it ranks 2,964th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Red Horse 2 plant run compared with other solar plants?
The Red Horse 2 plant's solar units had a capacity factor of 23% in 2025 on 51 MW of net summer capacity, the 48th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 83 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Red Horse 2 | 23% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Red Horse 2 plant generating more or less than last year?
Generation at Red Horse 2 fell 26.0% from 2024 to 2025, from 194,859 MWh to 144,209 MWh. Through August 2026 it is running 46.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 194,859 |
| 2025 | 144,209 |
| 2026 through August | 137,017 |
| 2025, same months | 93,314 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 15,841 |
| July 2026 | 16,721 |
| June 2026 | 21,006 |
| May 2026 | 21,187 |
| April 2026 | 17,310 |
| March 2026 | 15,251 |
| February 2026 | 15,899 |
| January 2026 | 13,802 |
| December 2025 | 11,885 |
| November 2025 | 12,124 |
| October 2025 | 14,045 |
| September 2025 | 12,841 |
| August 2025 | 13,972 |
| July 2025 | 0 |
| June 2025 | 0 |
| May 2025 | 15,541 |
| April 2025 | 20,504 |
| March 2025 | 18,891 |
| February 2025 | 12,489 |
| January 2025 | 11,917 |
| December 2024 | 14,285 |
| November 2024 | 12,689 |
| October 2024 | 14,470 |
| September 2024 | 16,271 |
| August 2024 | 14,553 |
| July 2024 | 17,336 |
| June 2024 | 18,528 |
| May 2024 | 22,737 |
| April 2024 | 19,746 |
| March 2024 | 17,485 |
| February 2024 | 13,711 |
| January 2024 | 13,048 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Red Horse 2 plant, and when do they retire?
2 operable generators total 81 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 81 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RH2S | Operating | Solar Photovoltaic | 51 | 2015 | n/a |
| RH2W | Operating | Onshore Wind Turbine | 30 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Red Horse 2 plant?
EIA lists no joint owners for Red Horse 2. Red Horse 2 operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Red Horse 2 plant use?
Red Horse 2 has capacity on 2 fuels: 63% solar and 37% wind. In 2025, solar made 71% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 51 | 63.0% | 102,027 |
| Wind | 30 | 37.0% | 42,182 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Red Horse 2 plant?
Red Horse 2 is in Willcox, Cochise County, Arizona, at 32.2861° N, 110.0881° W. It sits in the Tucson Electric Power Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arizona are similar in size?
Arizona has 111 operable solar plants with 6,672 MW of capacity, and Red Horse 2's 51 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Kayenta Solar Project | Navajo | 55 | 121,046 |
| Gray Hawk Solar | Mohave | 55 | 136,815 |
| Mesquite Solar 4, LLC | Maricopa | 53 | 145,865 |
| Red Horse 2 | Cochise | 51 | 102,027 |
| Bonnybrooke PV | Pinal | 50 | 90,825 |
| Sandstone Solar | Pinal | 45 | 116,882 |
| Red Rock | Maricopa | 44 | 90,309 |
Source: EIA Forms EIA-860 and EIA-923, 2025.