Solar power plant, Arizona

Red Rock solar power plant, Arizona

Red Rock is a 84.9 MW power plant, 43.9 MW of it solar, in Maricopa County, Arizona, operated by Arizona Public Service Co, and it generated 85,866 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 53rd percentile of U.S. solar plants. By 2025 generation it ranks 3,569th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

84.9 MWNameplate capacity
23%Capacity factor, 2025, solar units, 53rd percentile, on 43.9 MW net summer
0.1%Of AZ generation, 2025
5 yearsAverage generator age, by MW

How hard does the Red Rock plant run compared with other solar plants?

The Red Rock plant's solar units had a capacity factor of 23% in 2025 on 43.9 MW of net summer capacity, the 53rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 86 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Red Rock23%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Red Rock plant generating more or less than last year?

Generation at Red Rock fell 6.0% from 2024 to 2025, from 91,306 MWh to 85,866 MWh. Through August 2026 it is running 8.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202491,306
202585,866
2026 through August64,634
2025, same months59,761
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,275
July 202611,472
June 20269,533
May 20265,365
April 20268,686
March 20265,842
February 20266,008
January 20266,453
December 20256,175
November 20254,408
October 20258,554
September 20256,968
August 202511,220
July 20258,114
June 202510,594
May 202511,125
April 202510,761
March 20252,673
February 20252,588
January 20252,686
December 20242,089
November 20244,527
October 20249,368
September 202410,421
August 202410,709
July 202410,751
June 202410,195
May 20249,617
April 20247,647
March 20246,434
February 20245,846
January 20243,702

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Red Rock plant?

Red Rock made 0.1% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.2% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 84th largest of 191 plants in Arizona, the 2,905th largest of 14,327 in the U.S. and the 954th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 73rd largest of 167 generating plants in the state.

Red Rock within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)8540,5140.2%
Generation (MWh)85,866115,800,3780.1%
Solar capacity (MW)446,6720.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Red Rock plant, and when do they retire?

2 operable generators total 84.9 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s14452%none reported
2020s14148%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic442017n/a
RR40MOperatingBatteries412023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Red Rock plant?

EIA lists no joint owners for Red Rock. Arizona Public Service Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Arizona Public Service Co charge homes?

Arizona Public Service Co, the operator of Red Rock, had an average residential price of 17.03¢ per kWh and an average bill of $165 a month in 2025, 12% above the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
Arizona Public Service Co17.03¢$16512% higher
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Red Rock plant use?

Red Rock has capacity on 2 fuels: 52% solar and 48% battery and pumped storage. In 2025, solar made 105% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar4451.7%90,309
Battery and pumped storage4148.3%-4,443

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Red Rock plant?

Red Rock is in Red Rock, Maricopa County, Arizona, at 32.5510° N, 111.2892° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Red Rock's 43.9 MW is 1% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Red Horse 2Cochise51102,027
Bonnybrooke PVPinal5090,825
Sandstone SolarPinal45116,882
Red RockMaricopa4490,309
Foothills Solar Plant HybridYuma3886,350
Gila Bend HybridMaricopa3677,347
OE_AZ1La Paz3380,525

Source: EIA Forms EIA-860 and EIA-923, 2025.