Skip to main content
RateWatt

Solar power plant, Arizona

Oe_Az1 solar power plant, Arizona

Oe_Az1 is a 32.5 MW solar power plant in La Paz County, Arizona, operated by Onward Energy, and it generated 80,525 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 84th percentile of U.S. solar plants. By 2025 generation it ranks 3,636th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

32.5 MWNameplate capacity
28%Capacity factor, 2025, 84th percentile, on 32.5 MW net summer
0.1%Of AZ generation, 2025
5 yearsAverage generator age, by MW

How hard does the Oe_Az1 plant run compared with other solar plants?

The Oe_Az1 plant had a capacity factor of 28% in 2025 on 32.5 MW of net summer capacity, the 84th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 103 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Oe_Az128%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Oe_Az1 plant generating more or less than last year?

Generation at Oe_Az1 fell 6.9% from 2024 to 2025, from 86,514 MWh to 80,525 MWh. Through August 2026 it is running 6.1% behind the same months of 2025.

Net generation by period
PeriodMWh
202486,514
202580,525
2026 through August57,596
2025, same months61,362
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20267,007
July 20267,319
June 20268,430
May 20269,679
April 20268,076
March 20267,633
February 20265,119
January 20264,333
December 20253,722
November 20253,239
October 20255,963
September 20256,239
August 20257,929
July 20258,958
June 20259,294
May 20258,934
April 20258,637
March 20257,144
February 20255,537
January 20254,929
December 20244,133
November 20244,912
October 20246,511
September 20247,756
August 20248,434
July 20249,150
June 20249,407
May 202410,295
April 20249,322
March 20247,509
February 20244,958
January 20244,127

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Oe_Az1 plant?

Oe_Az1 made 0.1% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. By capacity it is the 109th largest of 191 plants in Arizona, the 4,293rd largest of 14,327 in the U.S. and the 999th largest of 7,223 solar plants. By 2025 generation it is the 74th largest of 167 generating plants in the state.

Oe_Az1 within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)3340,5140.1%
Generation (MWh)80,525115,800,3780.1%
Solar capacity (MW)336,6720.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Oe_Az1 plant, and when do they retire?

1 operable generator totals 32.5 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s133100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
AZ1OperatingSolar Photovoltaic332020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Oe_Az1 plant?

EIA lists no joint owners for Oe_Az1. Onward Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Oe_Az1 plant?

Oe_Az1 is in Salome, La Paz County, Arizona, at 33.7767° N, 113.6561° W. It sits in the Western Area Power Administration - Desert Southwest Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Oe_Az1's 32.5 MW is 0% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Red RockMaricopa4490,309
Foothills Solar Plant HybridYuma3886,350
Gila Bend HybridMaricopa3677,347
OE_AZ1La Paz3380,525
Hyder Solar HybridYuma3233,875
Red Horse IIICochise3055,637
Avalon SolarPima2964,176