Skip to main content
RateWatt

Solar power plant, Arizona

Hyder Solar Hybrid power plant, Arizona

Hyder Solar Hybrid is a 48 MW power plant, 32 MW of it solar, in Yuma County, Arizona, operated by Arizona Public Service Co, and it generated 31,232 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 9th percentile of U.S. solar plants. By 2025 generation it ranks 4,694th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

48 MWNameplate capacity
12%Capacity factor, 2025, solar units, 9th percentile, on 31 MW net summer
4,694thU.S. rank by generation, 2025
10 yearsAverage generator age, by MW

How hard does the Hyder Solar Hybrid plant run compared with other solar plants?

The Hyder Solar Hybrid plant's solar units had a capacity factor of 12% in 2025 on 31 MW of net summer capacity, the 9th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 46 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hyder Solar Hybrid12%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Hyder Solar Hybrid plant generating more or less than last year?

Hyder Solar Hybrid generated 31,232 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.

1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
202435,259
202531,232
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,745
November 20251,292
October 20251,920
September 20252,098
August 20253,588
July 20252,787
June 20253,574
May 20253,837
April 20253,776
March 20252,413
February 20252,021
January 20252,181
December 20241,280
November 20242,134
October 2024-180
September 20243,545
August 20243,645
July 20243,981
June 20244,161
May 20244,564
April 20244,274
March 20243,448
February 20242,444
January 20241,963

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Hyder Solar Hybrid plant?

Hyder Solar Hybrid made 0.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 99th largest of 191 plants in Arizona, the 3,894th largest of 14,327 in the U.S. and the 1,001st largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 104th largest of 167 generating plants in the state.

Hyder Solar Hybrid within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)4840,5140.1%
Generation (MWh)31,232115,800,3780.0%
Solar capacity (MW)326,6720.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hyder Solar Hybrid plant, and when do they retire?

3 operable generators total 48 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s23267%none reported
2020s11633%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic172011n/a
PV2OperatingSolar Photovoltaic152012n/a
H116MOperatingBatteries162023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hyder Solar Hybrid plant?

EIA lists no joint owners for Hyder Solar Hybrid. Arizona Public Service Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Arizona Public Service Co charge homes?

Arizona Public Service Co, the operator of Hyder Solar Hybrid, had an average residential price of 17.03¢ per kWh and an average bill of $165 a month in 2025, 12% above the Arizona average of 15.26¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Arizona
Arizona Public Service Co17.03¢$16512% higher
Arizona average15.26¢$157
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

What fuels does the Hyder Solar Hybrid plant use?

Hyder Solar Hybrid has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 108% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar3266.7%33,875
Battery and pumped storage1633.3%-2,643

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Hyder Solar Hybrid plant?

Hyder Solar Hybrid is in Hyder, Yuma County, Arizona, at 33.0257° N, 113.3440° W. It sits in the Arizona Public Service Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Hyder Solar Hybrid's 32 MW is 0% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Foothills Solar Plant HybridYuma3886,350
Gila Bend HybridMaricopa3677,347
OE_AZ1La Paz3380,525
Hyder Solar HybridYuma3233,875
Red Horse IIICochise3055,637
Avalon SolarPima2964,176
Avra Valley SolarPima2561,488

Source: EIA Forms EIA-860 and EIA-923, 2025.