Avalon Solar is a 29 MW solar power plant in Pima County, Arizona, operated by Arevon Energy, Inc., and it generated 64,176 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 66th percentile of U.S. solar plants. By 2025 generation it ranks 3,823rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

29 MWNameplate capacity
25%Capacity factor, 2025, 66th percentile, on 29 MW net summer
0.1%Of AZ generation, 2025
11 yearsAverage generator age, by MW

How hard does the Avalon Solar plant run compared with other solar plants?

The Avalon Solar plant had a capacity factor of 25% in 2025 on 29 MW of net summer capacity, the 66th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Avalon Solar25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Avalon Solar plant generating more or less than last year?

Generation at Avalon Solar fell 0.7% from 2024 to 2025, from 64,643 MWh to 64,176 MWh.

Net generation by period
PeriodMWh
202464,643
202564,176
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20253,330
November 20253,463
October 20254,659
September 20254,649
August 20254,977
July 20255,344
June 20257,602
May 20257,809
April 20257,366
March 20256,219
February 20254,755
January 20254,003
December 20243,849
November 20243,883
October 20244,448
September 20244,779
August 20244,909
July 20246,826
June 20246,815
May 20248,242
April 20247,261
March 20245,655
February 20244,327
January 20243,649

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Avalon Solar plant?

Avalon Solar made 0.1% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 112th largest of 191 plants in Arizona, the 4,430th largest of 14,327 in the U.S. and the 1,035th largest of 7,223 solar plants. By 2025 generation it is the 78th largest of 167 generating plants in the state.

Avalon Solar within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)2940,5140.1%
Generation (MWh)64,176115,800,3780.1%
Solar capacity (MW)296,6720.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Avalon Solar plant, and when do they retire?

1 operable generator totals 29 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s129100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ASOperatingSolar Photovoltaic292014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Avalon Solar plant?

EIA lists no joint owners for Avalon Solar. Arevon Energy, Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Avalon Solar plant?

Avalon Solar is in Pima, Pima County, Arizona, at 32.0014° N, 110.9606° W. It sits in the Tucson Electric Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Avalon Solar's 29 MW is 0% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
OE_AZ1La Paz3380,525
Hyder Solar HybridYuma3233,875
Red Horse IIICochise3055,637
Avalon SolarPima2964,176
Avra Valley SolarPima2561,488
Poseidon Solar, LLCGILA2048,761
Picture Rocks Solar, LLCPima2049,587

Source: EIA Forms EIA-860 and EIA-923, 2025.