Poseidon Solar, LLC is a 20 MW solar power plant in GILA County, Arizona, operated by Axium Arizona Renewables, LLC, and it generated 48,761 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 82nd percentile of U.S. solar plants. By 2025 generation it ranks 4,126th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
28%Capacity factor, 2025, 82nd percentile, on 20 MW net summer
4,126thU.S. rank by generation, 2025
14 yearsAverage generator age, by MW

How hard does the Poseidon Solar, LLC plant run compared with other solar plants?

The Poseidon Solar, LLC plant had a capacity factor of 28% in 2025 on 20 MW of net summer capacity, the 82nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 102 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Poseidon Solar, LLC28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Poseidon Solar, LLC plant generating more or less than last year?

Generation at Poseidon Solar, LLC fell 2.9% from 2024 to 2025, from 50,229 MWh to 48,761 MWh.

Net generation by period
PeriodMWh
202450,229
202548,761
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,511
November 20252,606
October 20253,502
September 20253,909
August 20254,720
July 20255,098
June 20255,703
May 20255,703
April 20255,009
March 20254,012
February 20253,177
January 20252,811
December 20242,617
November 20242,912
October 20243,886
September 20244,630
August 20244,891
July 20245,377
June 20245,151
May 20246,044
April 20245,503
March 20243,722
February 20243,010
January 20242,486

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Poseidon Solar, LLC plant?

Poseidon Solar, LLC made 0.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.0% of the state's 40,514 MW of capacity. By capacity it is the 118th largest of 191 plants in Arizona, the 4,775th largest of 14,327 in the U.S. and the 1,081st largest of 7,223 solar plants. By 2025 generation it is the 87th largest of 167 generating plants in the state.

Poseidon Solar, LLC within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)2040,5140.0%
Generation (MWh)48,761115,800,3780.0%
Solar capacity (MW)206,6720.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Poseidon Solar, LLC plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic202011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Poseidon Solar, LLC plant?

2 owners report shares in Poseidon Solar, LLC; Avangrid Power LLC holds the largest named share, 50.0% or about 10 MW. Axium Arizona Renewables, LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Avangrid Power LLC50.0%1024,381
Axium Arizona Renewables, LLC50.0%1024,381

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Poseidon Solar, LLC plant?

Poseidon Solar, LLC is in Globe, GILA County, Arizona, at 33.1606° N, 111.4840° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Poseidon Solar, LLC's 20 MW is 0% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Red Horse IIICochise3055,637
Avalon SolarPima2964,176
Avra Valley SolarPima2561,488
Poseidon Solar, LLCGILA2048,761
Picture Rocks Solar, LLCPima2049,587
Sulphur SpringsCochise2047,650
Apache Solar ICochise2055,357