Skip to main content
RateWatt

Solar power plant, Arizona

Apache Solar I power plant, Arizona

Apache Solar I is a 40 MW power plant, 20 MW of it solar, in Cochise County, Arizona, operated by Arizona Electric Pwr Coop Inc, and it generated 55,357 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 3,965th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

40 MWNameplate capacity
32%Capacity factor, 2025, solar units, 96th percentile, on 20 MW net summer
3,965thU.S. rank by generation, 2025
5 yearsAverage generator age, by MW

How hard does the Apache Solar I plant run compared with other solar plants?

The Apache Solar I plant's solar units had a capacity factor of 32% in 2025 on 20 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 115 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Apache Solar I32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Apache Solar I plant generating more or less than last year?

Generation at Apache Solar I fell 0.3% from 2024 to 2025, from 55,502 MWh to 55,357 MWh.

Net generation by period
PeriodMWh
202455,502
202555,357
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20253,014
November 20253,210
October 20254,010
September 20253,979
August 20255,069
July 20255,512
June 20256,082
May 20256,098
April 20255,897
March 20255,139
February 20253,790
January 20253,557
December 20243,241
November 20243,500
October 20244,394
September 20245,048
August 20244,831
July 20245,318
June 20245,520
May 20246,776
April 20245,930
March 20244,712
February 20243,480
January 20242,752

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Apache Solar I plant?

Apache Solar I made 0.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 101st largest of 191 plants in Arizona, the 4,074th largest of 14,327 in the U.S. and the 1,188th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 83rd largest of 167 generating plants in the state.

Apache Solar I within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)4040,5140.1%
Generation (MWh)55,357115,800,3780.0%
Solar capacity (MW)206,6720.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Apache Solar I plant, and when do they retire?

3 operable generators total 40 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s12050%none reported
2020s22050%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
AEPS1OperatingSolar Photovoltaic202017n/a
AEPB1OperatingBatteries102024n/a
TRIB1OperatingBatteries102024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Apache Solar I plant?

Sierra Southwest Cooperative is the only joint owner reported for Apache Solar I, with 100.0%. Arizona Electric Pwr Coop Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Apache Solar I plant use?

Apache Solar I has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar2050.0%55,357
Battery and pumped storage2050.0%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Apache Solar I plant?

Apache Solar I is in Cochise, Cochise County, Arizona, at 32.0681° N, 109.8904° W. It sits in the Western Area Power Administration - Desert Southwest Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Apache Solar I's 20 MW is 0% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Poseidon Solar, LLCGILA2048,761
Picture Rocks Solar, LLCPima2049,587
Sulphur SpringsCochise2047,650
Apache Solar ICochise2055,357
Pinal Central Energy Center HybridPinal2058,139
SR McNealCochise2055,359
Chino Valley SolarYavapai1936,515

Source: EIA Forms EIA-860 and EIA-923, 2025.