Solar power plant, Arizona

Pinal Central Energy Center Hybrid solar power plant, Arizona

Pinal Central Energy Center Hybrid is a 30 MW power plant, 20 MW of it solar, in Pinal County, Arizona, operated by Pinal Central Energy Center, LLC, and it generated 55,895 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 98th percentile of U.S. solar plants. By 2025 generation it ranks 3,952nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30 MWNameplate capacity
33%Capacity factor, 2025, solar units, 98th percentile, on 20 MW net summer
3,952ndU.S. rank by generation, 2025
7 yearsAverage generator age, by MW

How hard does the Pinal Central Energy Center Hybrid plant run compared with other solar plants?

The Pinal Central Energy Center Hybrid plant's solar units had a capacity factor of 33% in 2025 on 20 MW of net summer capacity, the 98th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 121 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pinal Central Energy Center Hybrid33%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Pinal Central Energy Center Hybrid plant generating more or less than last year?

Generation at Pinal Central Energy Center Hybrid rose 9.2% from 2024 to 2025, from 51,179 MWh to 55,895 MWh. Through August 2026 it is running 5.8% behind the same months of 2025.

Net generation by period
PeriodMWh
202451,179
202555,895
2026 through August38,459
2025, same months40,816
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20264,729
July 20264,813
June 20265,586
May 20266,256
April 20265,324
March 20265,238
February 20263,575
January 20262,938
December 20252,885
November 20253,098
October 20254,394
September 20254,702
August 20255,290
July 20255,505
June 20256,263
May 20256,282
April 20255,912
March 20254,921
February 20253,381
January 20253,262
December 20242,869
November 20243,027
October 20243,952
September 20244,882
August 20244,999
July 20245,559
June 20245,076
May 20246,212
April 20245,245
March 20244,721
February 20243,239
January 20241,398

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Pinal Central Energy Center Hybrid plant?

Pinal Central Energy Center Hybrid made 0.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 110th largest of 191 plants in Arizona, the 4,354th largest of 14,327 in the U.S. and the 1,203rd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 81st largest of 167 generating plants in the state.

Pinal Central Energy Center Hybrid within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)3040,5140.1%
Generation (MWh)55,895115,800,3780.0%
Solar capacity (MW)206,6720.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pinal Central Energy Center Hybrid plant, and when do they retire?

2 operable generators total 30 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s230100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BA1OperatingBatteries102018n/a
PCECOperatingSolar Photovoltaic202018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pinal Central Energy Center Hybrid plant?

EIA lists no joint owners for Pinal Central Energy Center Hybrid. Pinal Central Energy Center, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Pinal Central Energy Center Hybrid plant use?

Pinal Central Energy Center Hybrid has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 104% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar2066.7%58,139
Battery and pumped storage1033.3%-2,244

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Pinal Central Energy Center Hybrid plant?

Pinal Central Energy Center Hybrid is in Casa Grande, Pinal County, Arizona, at 32.8757° N, 111.5511° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Pinal Central Energy Center Hybrid's 20 MW is 0% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Picture Rocks Solar, LLCPima2049,587
Sulphur SpringsCochise2047,650
Apache Solar ICochise2055,357
Pinal Central Energy Center HybridPinal2058,139
SR McNealCochise2055,359
Chino Valley SolarYavapai1936,515
Queen Creek Solar FarmMaricopa1934,766