Solar power plant, Arizona
Pinal Central Energy Center Hybrid solar power plant, Arizona
Pinal Central Energy Center Hybrid is a 30 MW power plant, 20 MW of it solar, in Pinal County, Arizona, operated by Pinal Central Energy Center, LLC, and it generated 55,895 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 98th percentile of U.S. solar plants. By 2025 generation it ranks 3,952nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Pinal Central Energy Center Hybrid plant run compared with other solar plants?
The Pinal Central Energy Center Hybrid plant's solar units had a capacity factor of 33% in 2025 on 20 MW of net summer capacity, the 98th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 121 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Pinal Central Energy Center Hybrid | 33% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Pinal Central Energy Center Hybrid plant generating more or less than last year?
Generation at Pinal Central Energy Center Hybrid rose 9.2% from 2024 to 2025, from 51,179 MWh to 55,895 MWh. Through August 2026 it is running 5.8% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 51,179 |
| 2025 | 55,895 |
| 2026 through August | 38,459 |
| 2025, same months | 40,816 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 4,729 |
| July 2026 | 4,813 |
| June 2026 | 5,586 |
| May 2026 | 6,256 |
| April 2026 | 5,324 |
| March 2026 | 5,238 |
| February 2026 | 3,575 |
| January 2026 | 2,938 |
| December 2025 | 2,885 |
| November 2025 | 3,098 |
| October 2025 | 4,394 |
| September 2025 | 4,702 |
| August 2025 | 5,290 |
| July 2025 | 5,505 |
| June 2025 | 6,263 |
| May 2025 | 6,282 |
| April 2025 | 5,912 |
| March 2025 | 4,921 |
| February 2025 | 3,381 |
| January 2025 | 3,262 |
| December 2024 | 2,869 |
| November 2024 | 3,027 |
| October 2024 | 3,952 |
| September 2024 | 4,882 |
| August 2024 | 4,999 |
| July 2024 | 5,559 |
| June 2024 | 5,076 |
| May 2024 | 6,212 |
| April 2024 | 5,245 |
| March 2024 | 4,721 |
| February 2024 | 3,239 |
| January 2024 | 1,398 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Pinal Central Energy Center Hybrid plant, and when do they retire?
2 operable generators total 30 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 2 | 30 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BA1 | Operating | Batteries | 10 | 2018 | n/a |
| PCEC | Operating | Solar Photovoltaic | 20 | 2018 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Pinal Central Energy Center Hybrid plant?
EIA lists no joint owners for Pinal Central Energy Center Hybrid. Pinal Central Energy Center, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Pinal Central Energy Center Hybrid plant use?
Pinal Central Energy Center Hybrid has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 104% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 20 | 66.7% | 58,139 |
| Battery and pumped storage | 10 | 33.3% | -2,244 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Pinal Central Energy Center Hybrid plant?
Pinal Central Energy Center Hybrid is in Casa Grande, Pinal County, Arizona, at 32.8757° N, 111.5511° W. It sits in the Salt River Project balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arizona are similar in size?
Arizona has 111 operable solar plants with 6,672 MW of capacity, and Pinal Central Energy Center Hybrid's 20 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Picture Rocks Solar, LLC | Pima | 20 | 49,587 |
| Sulphur Springs | Cochise | 20 | 47,650 |
| Apache Solar I | Cochise | 20 | 55,357 |
| Pinal Central Energy Center Hybrid | Pinal | 20 | 58,139 |
| SR McNeal | Cochise | 20 | 55,359 |
| Chino Valley Solar | Yavapai | 19 | 36,515 |
| Queen Creek Solar Farm | Maricopa | 19 | 34,766 |
Source: EIA Forms EIA-860 and EIA-923, 2025.