Solar power plant, Arizona

SR McNeal solar power plant, Arizona

SR McNeal is a 40 MW power plant, 20 MW of it solar, in Cochise County, Arizona, operated by SR McNeal, LLC, and it generated 52,776 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 96th percentile of U.S. solar plants. By 2025 generation it ranks 4,030th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

40 MWNameplate capacity
32%Capacity factor, 2025, solar units, 96th percentile, on 20 MW net summer
4,030thU.S. rank by generation, 2025
2 yearsAverage generator age, by MW

How hard does the SR McNeal plant run compared with other solar plants?

The SR McNeal plant's solar units had a capacity factor of 32% in 2025 on 20 MW of net summer capacity, the 96th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 115 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
SR McNeal32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the SR McNeal plant generating more or less than last year?

Generation at SR McNeal fell 5.2% from 2024 to 2025, from 55,652 MWh to 52,776 MWh. Through August 2026 it is running 2.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202455,652
202552,776
2026 through August39,361
2025, same months38,370
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20265,387
July 20265,233
June 20265,739
May 20266,314
April 20264,919
March 20265,207
February 20263,653
January 20262,909
December 20252,996
November 20253,414
October 20254,116
September 20253,880
August 20255,035
July 20255,355
June 20256,041
May 20255,649
April 20255,207
March 20254,612
February 20253,378
January 20253,093
December 20243,216
November 20243,568
October 20244,639
September 20245,482
August 20245,272
July 20244,148
June 20245,347
May 20246,448
April 20245,771
March 20244,591
February 20243,823
January 20243,347

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the SR McNeal plant?

SR McNeal made 0.0% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 101st largest of 191 plants in Arizona, the 4,074th largest of 14,327 in the U.S. and the 1,274th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 85th largest of 167 generating plants in the state.

SR McNeal within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)4040,5140.1%
Generation (MWh)52,776115,800,3780.0%
Solar capacity (MW)206,6720.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the SR McNeal plant, and when do they retire?

2 operable generators total 40 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s240100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MCBAOperatingBatteries202023n/a
MCNEAOperatingSolar Photovoltaic202023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the SR McNeal plant?

EIA lists no joint owners for SR McNeal. SR McNeal, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the SR McNeal plant use?

SR McNeal has capacity on 2 fuels: 50% solar and 50% battery and pumped storage. In 2025, solar made 105% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar2050.0%55,359
Battery and pumped storage2050.0%-2,583

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the SR McNeal plant?

SR McNeal is in McNeal, Cochise County, Arizona, at 31.5551° N, 109.7013° W. It sits in the Tucson Electric Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and SR McNeal's 20 MW is 0% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Sulphur SpringsCochise2047,650
Apache Solar ICochise2055,357
Pinal Central Energy Center HybridPinal2058,139
SR McNealCochise2055,359
Chino Valley SolarYavapai1936,515
Queen Creek Solar FarmMaricopa1934,766
Fort Huachuca Solar PV ProjectCochise1834,826

Source: EIA Forms EIA-860 and EIA-923, 2025.