Solar power plant, Arizona

Sandstone Solar power plant, Arizona

Sandstone Solar is a 45 MW solar power plant in Pinal County, Arizona, operated by AES Distributed Energy, and it generated 116,882 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 94th percentile of U.S. solar plants. By 2025 generation it ranks 3,234th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

45 MWNameplate capacity
31%Capacity factor, 2025, 94th percentile, on 43 MW net summer
0.1%Of AZ generation, 2025
10 yearsAverage generator age, by MW

How hard does the Sandstone Solar plant run compared with other solar plants?

The Sandstone Solar plant had a capacity factor of 31% in 2025 on 43 MW of net summer capacity, the 94th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 113 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sandstone Solar31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sandstone Solar plant generating more or less than last year?

Generation at Sandstone Solar fell 0.3% from 2024 to 2025, from 117,222 MWh to 116,882 MWh.

Net generation by period
PeriodMWh
2024117,222
2025116,882
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20256,410
November 20256,791
October 20258,818
September 20259,274
August 202510,784
July 202511,954
June 202513,112
May 202512,942
April 202512,172
March 202510,184
February 20257,802
January 20256,639
December 20245,768
November 20245,926
October 20249,183
September 202411,245
August 202411,750
July 202413,269
June 202412,088
May 202413,788
April 202412,431
March 20249,159
February 20246,773
January 20245,842

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Sandstone Solar plant?

Sandstone Solar made 0.1% of the 115,800,378 MWh reported by Arizona plants in 2025, from 0.1% of the state's 40,514 MW of capacity. By capacity it is the 100th largest of 191 plants in Arizona, the 3,971st largest of 14,327 in the U.S. and the 944th largest of 7,223 solar plants. By 2025 generation it is the 68th largest of 167 generating plants in the state.

Sandstone Solar within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)4540,5140.1%
Generation (MWh)116,882115,800,3780.1%
Solar capacity (MW)456,6720.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sandstone Solar plant, and when do they retire?

1 operable generator totals 45 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s145100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SNDSTOperatingSolar Photovoltaic452015n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sandstone Solar plant?

EIA lists no joint owners for Sandstone Solar. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sandstone Solar plant?

Sandstone Solar is in Florence, Pinal County, Arizona, at 33.0356° N, 111.4303° W. It sits in the Salt River Project balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Arizona are similar in size?

Arizona has 111 operable solar plants with 6,672 MW of capacity, and Sandstone Solar's 45 MW is 1% of that.

Solar plants in Arizona around this size
PlantCountyMW2025 MWh
Mesquite Solar 4, LLCMaricopa53145,865
Red Horse 2Cochise51102,027
Bonnybrooke PVPinal5090,825
Sandstone SolarPinal45116,882
Red RockMaricopa4490,309
Foothills Solar Plant HybridYuma3886,350
Gila Bend HybridMaricopa3677,347

Source: EIA Forms EIA-860 and EIA-923, 2025.