Solar power plant, Arizona
Sandstone Solar power plant, Arizona
Sandstone Solar is a 45 MW solar power plant in Pinal County, Arizona, operated by AES Distributed Energy, and it generated 116,882 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 94th percentile of U.S. solar plants. By 2025 generation it ranks 3,234th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sandstone Solar plant run compared with other solar plants?
The Sandstone Solar plant had a capacity factor of 31% in 2025 on 43 MW of net summer capacity, the 94th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 113 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sandstone Solar | 31% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sandstone Solar plant generating more or less than last year?
Generation at Sandstone Solar fell 0.3% from 2024 to 2025, from 117,222 MWh to 116,882 MWh.
| Period | MWh |
|---|---|
| 2024 | 117,222 |
| 2025 | 116,882 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 6,410 |
| November 2025 | 6,791 |
| October 2025 | 8,818 |
| September 2025 | 9,274 |
| August 2025 | 10,784 |
| July 2025 | 11,954 |
| June 2025 | 13,112 |
| May 2025 | 12,942 |
| April 2025 | 12,172 |
| March 2025 | 10,184 |
| February 2025 | 7,802 |
| January 2025 | 6,639 |
| December 2024 | 5,768 |
| November 2024 | 5,926 |
| October 2024 | 9,183 |
| September 2024 | 11,245 |
| August 2024 | 11,750 |
| July 2024 | 13,269 |
| June 2024 | 12,088 |
| May 2024 | 13,788 |
| April 2024 | 12,431 |
| March 2024 | 9,159 |
| February 2024 | 6,773 |
| January 2024 | 5,842 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sandstone Solar plant, and when do they retire?
1 operable generator totals 45 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 45 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SNDST | Operating | Solar Photovoltaic | 45 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sandstone Solar plant?
EIA lists no joint owners for Sandstone Solar. AES Distributed Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sandstone Solar plant?
Sandstone Solar is in Florence, Pinal County, Arizona, at 33.0356° N, 111.4303° W. It sits in the Salt River Project balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Arizona are similar in size?
Arizona has 111 operable solar plants with 6,672 MW of capacity, and Sandstone Solar's 45 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mesquite Solar 4, LLC | Maricopa | 53 | 145,865 |
| Red Horse 2 | Cochise | 51 | 102,027 |
| Bonnybrooke PV | Pinal | 50 | 90,825 |
| Sandstone Solar | Pinal | 45 | 116,882 |
| Red Rock | Maricopa | 44 | 90,309 |
| Foothills Solar Plant Hybrid | Yuma | 38 | 86,350 |
| Gila Bend Hybrid | Maricopa | 36 | 77,347 |
Source: EIA Forms EIA-860 and EIA-923, 2025.