Agua Mansa Power Plant is a 60.5 MW natural gas power plant in San Bernardino County, California, operated by E I Colton LLC, and it generated 3,753 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 10th percentile of U.S. natural gas plants. By 2025 generation it ranks 8,970th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Agua Mansa Power Plant run compared with other natural gas plants?
Agua Mansa Power Plant had a capacity factor of 1% in 2025 on 40 MW of net summer capacity, the 10th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 4 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Agua Mansa Power Plant | 1% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Agua Mansa Power Plant generating more or less than last year?
Generation at Agua Mansa Power Plant fell 57.4% from 2024 to 2025, from 8,812 MWh to 3,753 MWh.
| Period | MWh |
|---|---|
| 2024 | 8,812 |
| 2025 | 3,753 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 307 |
| November 2025 | 367 |
| October 2025 | 333 |
| September 2025 | 422 |
| August 2025 | 474 |
| July 2025 | 333 |
| June 2025 | 257 |
| May 2025 | 223 |
| April 2025 | 183 |
| March 2025 | 206 |
| February 2025 | 276 |
| January 2025 | 371 |
| December 2024 | 781 |
| November 2024 | 712 |
| October 2024 | 884 |
| September 2024 | 844 |
| August 2024 | 958 |
| July 2024 | 1,103 |
| June 2024 | 574 |
| May 2024 | 373 |
| April 2024 | 415 |
| March 2024 | 487 |
| February 2024 | 680 |
| January 2024 | 1,003 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Agua Mansa Power Plant, and when do they retire?
1 operable generator totals 60.5 MW, with an average age of 22 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 61 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| AMP1 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2003 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Agua Mansa Power Plant?
City of Colton-(CA) is the only joint owner reported for Agua Mansa Power Plant, with 100.0%. E I Colton LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Agua Mansa Power Plant?
Agua Mansa Power Plant is in Colton, San Bernardino County, California, at 34.0414° N, 117.3603° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and Agua Mansa Power Plant's 60.5 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| CalPeak Power Vaca Dixon Peaker Plant | Solano | 61 | 6,947 |
| CalPeak Power Panoche Peaker Plant | Fresno | 61 | 1,871 |
| Border Hybrid Energy Center | San Diego | 61 | 9,104 |
| Agua Mansa Power Plant | San Bernardino | 61 | 3,753 |
| El Cajon Energy Center | San Diego | 61 | 19,841 |
| Delano Energy Center | Tulare | 61 | 2,394 |
| CalPeak Power Enterprise Peaker Plant | San Diego | 59 | 2,206 |
Source: EIA Forms EIA-860 and EIA-923, 2025.