Border Hybrid Energy Center is a 115 MW power plant, 60.5 MW of it natural gas, in San Diego County, California, operated by CalPeak Power, LLC, and it generated 9,104 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 15th percentile of U.S. natural gas plants. By 2025 generation it ranks 6,336th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Border Hybrid Energy Center plant run compared with other natural gas plants?
The Border Hybrid Energy Center plant's natural gas units had a capacity factor of 2% in 2025 on 48 MW of net summer capacity, the 15th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 8 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Border Hybrid Energy Center | 2% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.
Is the Border Hybrid Energy Center plant generating more or less than last year?
Generation at Border Hybrid Energy Center fell 38.5% from 2024 to 2025, from 14,804 MWh to 9,104 MWh.
| Period | MWh |
|---|---|
| 2024 | 14,804 |
| 2025 | 9,104 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 774 |
| November 2025 | 568 |
| October 2025 | 614 |
| September 2025 | 3,451 |
| August 2025 | 1,478 |
| July 2025 | 446 |
| June 2025 | 43 |
| May 2025 | 128 |
| April 2025 | 236 |
| March 2025 | 612 |
| February 2025 | 223 |
| January 2025 | 531 |
| December 2024 | 157 |
| November 2024 | 1,179 |
| October 2024 | 2,874 |
| September 2024 | 3,250 |
| August 2024 | 2,469 |
| July 2024 | 3,483 |
| June 2024 | 679 |
| May 2024 | 23 |
| April 2024 | 62 |
| March 2024 | 39 |
| February 2024 | 251 |
| January 2024 | 338 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Border Hybrid Energy Center plant, and when do they retire?
2 operable generators total 115 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 61 | 53% | none reported |
| 2020s | 1 | 54 | 47% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CPP4 | Operating | Natural Gas Fired Combustion Turbine | 61 | 2001 | n/a |
| HER | Operating | Batteries | 54 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Border Hybrid Energy Center plant?
CalPeak Power-Border LLC is the only joint owner reported for Border Hybrid Energy Center, with 52.8%. CalPeak Power, LLC operates the plant. The listed shares add up to 52.8% of capacity; generators without joint owners are not on this list.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Border Hybrid Energy Center plant use?
Border Hybrid Energy Center has capacity on 2 fuels: 53% natural gas and 47% battery and pumped storage. In 2025, natural gas made 100% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Natural gas | 61 | 52.8% | 9,104 |
| Battery and pumped storage | 54 | 47.2% | 0 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Border Hybrid Energy Center plant?
Border Hybrid Energy Center is in San Diego, San Diego County, California, at 32.5624° N, 116.9439° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in California are similar in size?
California has 304 operable natural gas plants with 40,211 MW of capacity, and Border Hybrid Energy Center's 60.5 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Lake One | Los Angeles | 61 | 3,387 |
| CalPeak Power Vaca Dixon Peaker Plant | Solano | 61 | 6,947 |
| CalPeak Power Panoche Peaker Plant | Fresno | 61 | 1,871 |
| Border Hybrid Energy Center | San Diego | 61 | 9,104 |
| Agua Mansa Power Plant | San Bernardino | 61 | 3,753 |
| El Cajon Energy Center | San Diego | 61 | 19,841 |
| Delano Energy Center | Tulare | 61 | 2,394 |
Source: EIA Forms EIA-860 and EIA-923, 2025.