Natural gas power plant, California

Border Hybrid Energy Center, California

Border Hybrid Energy Center is a 115 MW power plant, 60.5 MW of it natural gas, in San Diego County, California, operated by CalPeak Power, LLC, and it generated 9,104 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 15th percentile of U.S. natural gas plants. By 2025 generation it ranks 6,336th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

115 MWNameplate capacity
2%Capacity factor, 2025, natural gas units, 15th percentile, on 48 MW net summer
6,336thU.S. rank by generation, 2025
13 yearsAverage generator age, by MW

How hard does the Border Hybrid Energy Center plant run compared with other natural gas plants?

The Border Hybrid Energy Center plant's natural gas units had a capacity factor of 2% in 2025 on 48 MW of net summer capacity, the 15th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 8 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Border Hybrid Energy Center2%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its natural gas generators only. Values above 105% are left out of the comparison.

Is the Border Hybrid Energy Center plant generating more or less than last year?

Generation at Border Hybrid Energy Center fell 38.5% from 2024 to 2025, from 14,804 MWh to 9,104 MWh.

Net generation by period
PeriodMWh
202414,804
20259,104
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025774
November 2025568
October 2025614
September 20253,451
August 20251,478
July 2025446
June 202543
May 2025128
April 2025236
March 2025612
February 2025223
January 2025531
December 2024157
November 20241,179
October 20242,874
September 20243,250
August 20242,469
July 20243,483
June 2024679
May 202423
April 202462
March 202439
February 2024251
January 2024338

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Border Hybrid Energy Center plant?

Border Hybrid Energy Center made 0.0% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 244th largest of 1,877 plants in California, the 2,393rd largest of 14,327 in the U.S. and the 1,024th largest of 1,962 natural gas plants on its natural gas units alone. By 2025 generation it is the 846th largest of 1,608 generating plants in the state.

Border Hybrid Energy Center within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)115107,4330.1%
Generation (MWh)9,104204,542,8980.0%
Natural gas capacity (MW)6140,2110.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Border Hybrid Energy Center plant, and when do they retire?

2 operable generators total 115 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s16153%none reported
2020s15447%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CPP4OperatingNatural Gas Fired Combustion Turbine612001n/a
HEROperatingBatteries542025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Border Hybrid Energy Center plant?

CalPeak Power-Border LLC is the only joint owner reported for Border Hybrid Energy Center, with 52.8%. CalPeak Power, LLC operates the plant. The listed shares add up to 52.8% of capacity; generators without joint owners are not on this list.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Border Hybrid Energy Center plant use?

Border Hybrid Energy Center has capacity on 2 fuels: 53% natural gas and 47% battery and pumped storage. In 2025, natural gas made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Natural gas6152.8%9,104
Battery and pumped storage5447.2%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Border Hybrid Energy Center plant?

Border Hybrid Energy Center is in San Diego, San Diego County, California, at 32.5624° N, 116.9439° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in California are similar in size?

California has 304 operable natural gas plants with 40,211 MW of capacity, and Border Hybrid Energy Center's 60.5 MW is 0% of that.

Natural gas plants in California around this size
PlantCountyMW2025 MWh
Lake OneLos Angeles613,387
CalPeak Power Vaca Dixon Peaker PlantSolano616,947
CalPeak Power Panoche Peaker PlantFresno611,871
Border Hybrid Energy CenterSan Diego619,104
Agua Mansa Power PlantSan Bernardino613,753
El Cajon Energy CenterSan Diego6119,841
Delano Energy CenterTulare612,394

Source: EIA Forms EIA-860 and EIA-923, 2025.