Natural gas power plant, Wisconsin
Alliant Energy Neenah natural gas power plant, Wisconsin
Alliant Energy Neenah is a 371 MW natural gas power plant in Winnebago County, Wisconsin, operated by Wisconsin Power & Light Co, and it generated 482,736 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Wisconsin, and its capacity factor sits at the 43rd percentile of U.S. natural gas plants. By 2025 generation it ranks 1,374th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Alliant Energy Neenah plant run compared with other natural gas plants?
The Alliant Energy Neenah plant had a capacity factor of 16% in 2025 on 351 MW of net summer capacity, the 43rd percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 57 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Alliant Energy Neenah | 16% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Alliant Energy Neenah plant generating more or less than last year?
Generation at Alliant Energy Neenah fell 34.8% from 2024 to 2025, from 739,903 MWh to 482,736 MWh.
| Period | MWh |
|---|---|
| 2024 | 739,903 |
| 2025 | 482,736 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 34,351 |
| November 2025 | 24,411 |
| October 2025 | 27,196 |
| September 2025 | 10,602 |
| August 2025 | 60,746 |
| July 2025 | 129,060 |
| June 2025 | 104,795 |
| May 2025 | 40,619 |
| April 2025 | 20,570 |
| March 2025 | 12,769 |
| February 2025 | 12,128 |
| January 2025 | 5,489 |
| December 2024 | 36,138 |
| November 2024 | 43,586 |
| October 2024 | 80,467 |
| September 2024 | 73,842 |
| August 2024 | 65,777 |
| July 2024 | 142,307 |
| June 2024 | 54,471 |
| May 2024 | 71,742 |
| April 2024 | 39,069 |
| March 2024 | 6,179 |
| February 2024 | 47,143 |
| January 2024 | 79,182 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Alliant Energy Neenah plant, and when do they retire?
2 operable generators total 371 MW, with an average age of 25 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 371 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CT01 | Operating | Natural Gas Fired Combustion Turbine | 186 | 2000 | n/a |
| CT02 | Operating | Natural Gas Fired Combustion Turbine | 186 | 2000 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Alliant Energy Neenah plant?
EIA lists no joint owners for Alliant Energy Neenah. Wisconsin Power & Light Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Wisconsin Power & Light Co charge homes?
Wisconsin Power & Light Co, the operator of Alliant Energy Neenah, had an average residential price of 18.47¢ per kWh and an average bill of $128 a month in 2025, 2% above the Wisconsin average of 18.08¢.
| Measure | Price | Monthly bill | Against Wisconsin |
|---|---|---|---|
| Wisconsin Power & Light Co | 18.47¢ | $128 | 2% higher |
| Wisconsin average | 18.08¢ | $121 | |
| U.S. average | 17.23¢ | $151 | 5% lower |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Alliant Energy Neenah plant?
Alliant Energy Neenah is in Neenah, Winnebago County, Wisconsin, at 44.1936° N, 88.5064° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Wisconsin are similar in size?
Wisconsin has 38 operable natural gas plants with 7,824 MW of capacity, and Alliant Energy Neenah's 371 MW is 5% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Concord | Jefferson | 382 | 201,107 |
| South Fond Du Lac | Fond Du Lac | 382 | 20,258 |
| Paris (WI) | Kenosha | 382 | 215,003 |
| Alliant Energy Neenah | Winnebago | 371 | 482,736 |
| Sheboygan Falls | Sheboygan | 347 | 452,483 |
| Whitewater Generating Station | Jefferson | 284 | 748,227 |
| Valley (WI) | Milwaukee | 272 | 369,729 |
Source: EIA Forms EIA-860 and EIA-923, 2025.