Atchison County Wind is a 299 MW wind power plant in Atchison County, Missouri, operated by Union Electric Co-(MO), and it generated 857,865 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Missouri, and its capacity factor sits at the 59th percentile of U.S. wind plants. By 2025 generation it ranks 827th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

299 MWNameplate capacity
36%Capacity factor, 2025, 59th percentile, on 276 MW net summer
1.2%Of MO generation, 2025
4 yearsAverage generator age, by MW

How hard does the Atchison County Wind plant run compared with other wind plants?

The Atchison County Wind plant had a capacity factor of 36% in 2025 on 276 MW of net summer capacity, the 59th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 130 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Atchison County Wind36%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Atchison County Wind plant generating more or less than last year?

Generation at Atchison County Wind fell 7.8% from 2024 to 2025, from 930,777 MWh to 857,865 MWh. Through August 2026 it is running 11.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024930,777
2025857,865
2026 through August512,559
2025, same months581,304
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,422
July 202636,785
June 202659,342
May 202657,547
April 202697,191
March 202685,979
February 202665,342
January 202677,951
December 202583,999
November 202576,491
October 202577,602
September 202538,469
August 202543,586
July 202546,216
June 202562,068
May 202557,054
April 202597,547
March 2025105,315
February 202583,868
January 202585,650
December 202477,106
November 202481,047
October 2024100,721
September 202461,409
August 202452,039
July 202444,240
June 202477,587
May 202477,099
April 2024119,864
March 2024113,403
February 202487,253
January 202439,009

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the Atchison County Wind plant?

Atchison County Wind made 1.2% of the 71,443,096 MWh reported by Missouri plants in 2025, from 1.3% of the state's 23,215 MW of capacity. By capacity it is the 21st largest of 137 plants in Missouri, the 1,095th largest of 14,327 in the U.S. and the 96th largest of 1,358 wind plants. By 2025 generation it is the 14th largest of 122 generating plants in the state.

Atchison County Wind within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)29923,2151.3%
Generation (MWh)857,86571,443,0961.2%
Wind capacity (MW)2992,45412.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Atchison County Wind plant, and when do they retire?

1 operable generator totals 299 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1299100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingOnshore Wind Turbine2992021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Atchison County Wind plant?

EIA lists no joint owners for Atchison County Wind. Union Electric Co-(MO) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Union Electric Co charge homes?

Union Electric Co, the operator of Atchison County Wind, had an average residential price of 13.27¢ per kWh and an average bill of $137 a month in 2025, about the same as the Missouri average of 13.30¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Missouri
Union Electric Co13.27¢$137about the same
Missouri average13.30¢$138
U.S. average17.23¢$15130% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Atchison County Wind plant?

Atchison County Wind is in Westboro, Atchison County, Missouri, at 40.5313° N, 95.3549° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Missouri are similar in size?

Missouri has 14 operable wind plants with 2,454 MW of capacity, and Atchison County Wind's 299 MW is 12% of that.

Wind plants in Missouri around this size
PlantCountyMW2025 MWh
High Prairie Wind FarmSchuyler400465,769
Rock Creek Wind ProjectAtchison3001,036,492
Atchison County WindAtchison299857,865
Clear Creek WindNodaway242466,222
White Cloud Wind Project, LLCNodaway237828,191
Osborn Wind EnergyDeKalb201671,868

Source: EIA Forms EIA-860 and EIA-923, 2025.