Wind power plant, Missouri

Clear Creek Wind power plant, Missouri

Clear Creek Wind is a 242 MW wind power plant in Nodaway County, Missouri, operated by Clear Creek Wind, LLC, and it generated 466,222 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Missouri, and its capacity factor sits at the 14th percentile of U.S. wind plants. By 2025 generation it ranks 1,414th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

242 MWNameplate capacity
22%Capacity factor, 2025, 14th percentile, on 242 MW net summer
0.7%Of MO generation, 2025
5 yearsAverage generator age, by MW

How hard does the Clear Creek Wind plant run compared with other wind plants?

The Clear Creek Wind plant had a capacity factor of 22% in 2025 on 242 MW of net summer capacity, the 14th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 80 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Clear Creek Wind22%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Clear Creek Wind plant generating more or less than last year?

Generation at Clear Creek Wind fell 17.7% from 2024 to 2025, from 566,783 MWh to 466,222 MWh. Through August 2026 it is running 41.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024566,783
2025466,222
2026 through August431,468
2025, same months305,770
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202639,204
July 202629,793
June 202647,592
May 202644,055
April 202671,716
March 202678,509
February 202655,246
January 202665,353
December 202563,903
November 202533,541
October 202533,514
September 202529,494
August 202528,822
July 202533,502
June 202532,814
May 202533,914
April 202533,241
March 202552,863
February 202539,225
January 202551,389
December 202438,570
November 202427,593
October 202436,159
September 202441,066
August 202443,679
July 202435,576
June 202443,470
May 202450,169
April 202453,954
March 202471,931
February 202468,890
January 202455,726

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the Clear Creek Wind plant?

Clear Creek Wind made 0.7% of the 71,443,096 MWh reported by Missouri plants in 2025, from 1.0% of the state's 23,215 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 26th largest of 137 plants in Missouri, the 1,306th largest of 14,327 in the U.S. and the 161st largest of 1,358 wind plants. By 2025 generation it is the 21st largest of 122 generating plants in the state.

Clear Creek Wind within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)24223,2151.0%
Generation (MWh)466,22271,443,0960.7%
Wind capacity (MW)2422,4549.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Clear Creek Wind plant, and when do they retire?

2 operable generators total 242 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2242100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
V110OperatingOnshore Wind Turbine222020n/a
V120OperatingOnshore Wind Turbine2202020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Clear Creek Wind plant?

Tenaska Clear Creek Debt Holdco, LLC is the only joint owner reported for Clear Creek Wind, with 100.0%. Clear Creek Wind, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Clear Creek Wind plant?

Clear Creek Wind is in Maryville, Nodaway County, Missouri, at 40.3698° N, 94.8920° W. It sits in the Associated Electric Cooperative, Inc. balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Missouri are similar in size?

Missouri has 14 operable wind plants with 2,454 MW of capacity, and Clear Creek Wind's 242 MW is 10% of that.

Wind plants in Missouri around this size
PlantCountyMW2025 MWh
High Prairie Wind FarmSchuyler400465,769
Rock Creek Wind ProjectAtchison3001,036,492
Atchison County WindAtchison299857,865
Clear Creek WindNodaway242466,222
White Cloud Wind Project, LLCNodaway237828,191
Osborn Wind EnergyDeKalb201671,868
Lost Creek Wind Energy FacilityDeKalb168380,290

Source: EIA Forms EIA-860 and EIA-923, 2025.