Wind power plant, Missouri

High Prairie Wind Farm, Missouri

High Prairie Wind Farm is a 400 MW wind power plant in Schuyler County, Missouri, operated by Union Electric Co-(MO), and it generated 465,769 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Missouri, and its capacity factor sits at the 4th percentile of U.S. wind plants. By 2025 generation it ranks 1,419th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

400 MWNameplate capacity
14%Capacity factor, 2025, 4th percentile, on 376 MW net summer
0.7%Of MO generation, 2025
5 yearsAverage generator age, by MW

How hard does the High Prairie Wind Farm plant run compared with other wind plants?

The High Prairie Wind Farm plant had a capacity factor of 14% in 2025 on 376 MW of net summer capacity, the 4th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 52 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
High Prairie Wind Farm14%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the High Prairie Wind Farm plant generating more or less than last year?

Generation at High Prairie Wind Farm fell 28.2% from 2024 to 2025, from 648,681 MWh to 465,769 MWh. Through August 2026 it is running 178.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024648,681
2025465,769
2026 through August589,295
2025, same months211,658
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202619,907
July 202620,029
June 202644,610
May 202640,684
April 202686,748
March 2026147,890
February 2026108,723
January 2026120,704
December 2025118,433
November 202598,155
October 202527,300
September 202510,223
August 202514,912
July 202519,682
June 202530,866
May 202534,197
April 202546,399
March 202545,129
February 20259,447
January 202511,026
December 20247,911
November 20244,886
October 202438,861
September 202414,392
August 202423,160
July 202429,698
June 202451,483
May 202417,377
April 202476,746
March 2024145,932
February 2024130,588
January 2024107,647

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the High Prairie Wind Farm plant?

High Prairie Wind Farm made 0.7% of the 71,443,096 MWh reported by Missouri plants in 2025, from 1.7% of the state's 23,215 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 15th largest of 137 plants in Missouri, the 849th largest of 14,327 in the U.S. and the 26th largest of 1,358 wind plants. By 2025 generation it is the 22nd largest of 122 generating plants in the state.

High Prairie Wind Farm within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)40023,2151.7%
Generation (MWh)465,76971,443,0960.7%
Wind capacity (MW)4002,45416.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the High Prairie Wind Farm plant, and when do they retire?

1 operable generator totals 400 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1400100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HPWFOperatingOnshore Wind Turbine4002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the High Prairie Wind Farm plant?

EIA lists no joint owners for High Prairie Wind Farm. Union Electric Co-(MO) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Union Electric Co charge homes?

Union Electric Co, the operator of High Prairie Wind Farm, had an average residential price of 13.27¢ per kWh and an average bill of $137 a month in 2025, about the same as the Missouri average of 13.30¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Missouri
Union Electric Co13.27¢$137about the same
Missouri average13.30¢$138
U.S. average17.23¢$15130% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the High Prairie Wind Farm plant?

High Prairie Wind Farm is in Queen City, Schuyler County, Missouri, at 40.3982° N, 92.5186° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Missouri are similar in size?

Missouri has 14 operable wind plants with 2,454 MW of capacity, and High Prairie Wind Farm's 400 MW is 16% of that.

Wind plants in Missouri around this size
PlantCountyMW2025 MWh
High Prairie Wind FarmSchuyler400465,769
Rock Creek Wind ProjectAtchison3001,036,492
Atchison County WindAtchison299857,865
Clear Creek WindNodaway242466,222

Source: EIA Forms EIA-860 and EIA-923, 2025.