Wind power plant, Texas

Azure Sky Wind Project, LLC Hybrid power plant, Texas

Azure Sky Wind Project, LLC Hybrid is a 470 MW power plant, 350 MW of it wind, in Throckmorton County, Texas, operated by Azure Sky Wind Project, LLC, and it generated 1,207,187 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 72nd percentile of U.S. wind plants. By 2025 generation it ranks 660th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

470 MWNameplate capacity
40%Capacity factor, 2025, wind units, 72nd percentile, on 350 MW net summer
0.2%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Azure Sky Wind Project, LLC Hybrid plant run compared with other wind plants?

The Azure Sky Wind Project, LLC Hybrid plant's wind units had a capacity factor of 40% in 2025 on 350 MW of net summer capacity, the 72nd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 145 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Azure Sky Wind Project, LLC Hybrid40%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.

Is the Azure Sky Wind Project, LLC Hybrid plant generating more or less than last year?

Generation at Azure Sky Wind Project, LLC Hybrid rose 3.7% from 2024 to 2025, from 1,163,641 MWh to 1,207,187 MWh. Through August 2026 it is running 6.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20241,163,641
20251,207,187
2026 through August868,162
2025, same months818,398
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202697,183
July 202679,493
June 2026119,885
May 202699,897
April 2026120,917
March 2026146,922
February 2026100,631
January 2026103,234
December 2025122,476
November 202599,537
October 202596,234
September 202570,542
August 202577,527
July 202582,229
June 2025102,223
May 202590,509
April 2025131,365
March 2025139,961
February 202593,748
January 2025100,836
December 202493,494
November 2024110,228
October 2024107,645
September 202453,205
August 202478,881
July 202479,098
June 202495,238
May 202499,670
April 2024124,766
March 2024114,117
February 2024117,486
January 202489,813

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Azure Sky Wind Project, LLC Hybrid plant?

Azure Sky Wind Project, LLC Hybrid made 0.2% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.2% of the state's 195,966 MW of capacity. By capacity it is the 112th largest of 1,023 plants in Texas, the 775th largest of 14,327 in the U.S. and the 35th largest of 1,358 wind plants on its wind units alone. By 2025 generation it is the 99th largest of 816 generating plants in the state.

Azure Sky Wind Project, LLC Hybrid within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)470195,9660.2%
Generation (MWh)1,207,187592,896,1760.2%
Wind capacity (MW)35043,9420.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Azure Sky Wind Project, LLC Hybrid plant, and when do they retire?

2 operable generators total 470 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2470100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ASWBEOperatingBatteries1202023n/a
ASWWTOperatingOnshore Wind Turbine3502024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Azure Sky Wind Project, LLC Hybrid plant?

EIA lists no joint owners for Azure Sky Wind Project, LLC Hybrid. Azure Sky Wind Project, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Azure Sky Wind Project, LLC Hybrid plant use?

Azure Sky Wind Project, LLC Hybrid has capacity on 2 fuels: 74% wind and 26% battery and pumped storage. In 2025, wind made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Wind35074.5%1,221,957
Battery and pumped storage12025.5%-14,770

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Azure Sky Wind Project, LLC Hybrid plant?

Azure Sky Wind Project, LLC Hybrid is in Throckmorton, Throckmorton County, Texas, at 33.1691° N, 99.2660° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Azure Sky Wind Project, LLC Hybrid's 350 MW is 1% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Stephens Ranch Wind Energy LLCBorden376896,710
Western Trail Wind, LLCWilbarger3671,130,821
Foard City WindFoard3531,138,381
Azure Sky Wind Project, LLC HybridThrockmorton3501,221,957
BMP Wind (TX)Callahan340870,423
Sage Draw WindLynn3381,151,623
TG EastKnox336980,794

Source: EIA Forms EIA-860 and EIA-923, 2025.