Wind power plant, Texas
Foard City Wind power plant, Texas
Foard City Wind is a 353 MW wind power plant in Foard County, Texas, operated by Foard City Wind, LLC, and it generated 1,138,381 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Texas, and its capacity factor sits at the 64th percentile of U.S. wind plants. By 2025 generation it ranks 684th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Foard City Wind plant run compared with other wind plants?
The Foard City Wind plant had a capacity factor of 37% in 2025 on 350 MW of net summer capacity, the 64th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 135 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Foard City Wind | 37% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Foard City Wind plant generating more or less than last year?
Generation at Foard City Wind fell 1.1% from 2024 to 2025, from 1,150,962 MWh to 1,138,381 MWh. Through August 2026 it is running 15.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 1,150,962 |
| 2025 | 1,138,381 |
| 2026 through August | 885,358 |
| 2025, same months | 767,263 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 102,574 |
| July 2026 | 93,323 |
| June 2026 | 126,561 |
| May 2026 | 103,768 |
| April 2026 | 118,728 |
| March 2026 | 136,907 |
| February 2026 | 93,768 |
| January 2026 | 109,729 |
| December 2025 | 119,115 |
| November 2025 | 98,237 |
| October 2025 | 89,307 |
| September 2025 | 64,459 |
| August 2025 | 66,461 |
| July 2025 | 78,801 |
| June 2025 | 98,372 |
| May 2025 | 74,308 |
| April 2025 | 120,622 |
| March 2025 | 132,982 |
| February 2025 | 91,327 |
| January 2025 | 104,390 |
| December 2024 | 84,222 |
| November 2024 | 94,858 |
| October 2024 | 101,390 |
| September 2024 | 53,505 |
| August 2024 | 83,020 |
| July 2024 | 86,460 |
| June 2024 | 96,636 |
| May 2024 | 99,097 |
| April 2024 | 129,616 |
| March 2024 | 118,795 |
| February 2024 | 119,229 |
| January 2024 | 84,134 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Foard City Wind plant, and when do they retire?
1 operable generator totals 353 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 353 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FOARD | Operating | Onshore Wind Turbine | 353 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Foard City Wind plant?
EIA lists no joint owners for Foard City Wind. Foard City Wind, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Foard City Wind plant?
Foard City Wind is in Crowell, Foard County, Texas, at 33.9153° N, 99.7403° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Foard City Wind's 353 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mesquite Star | Nolan | 419 | 1,150,168 |
| Stephens Ranch Wind Energy LLC | Borden | 376 | 896,710 |
| Western Trail Wind, LLC | Wilbarger | 367 | 1,130,821 |
| Foard City Wind | Foard | 353 | 1,138,381 |
| Azure Sky Wind Project, LLC Hybrid | Throckmorton | 350 | 1,221,957 |
| BMP Wind (TX) | Callahan | 340 | 870,423 |
| Sage Draw Wind | Lynn | 338 | 1,151,623 |
Source: EIA Forms EIA-860 and EIA-923, 2025.